Nuvo Koolspace 250 Скачать руководство пользователя страница 7

~6~

~7~

Open Box VP3.

Fasten    one 

HINGE  (found  in 

door  box)

  to  the 

SIDE

  of  the 

cabinet

Install  four 

LEGS 

(H)  into 

BASES 

 fully in.

Fasten

  FRONT

 

BASE 

  to 

the 

BOTTOM 

of  the  cabinet 

(

FRONT  BASE 

has  to  be  set 

with end tabs away from front 

edge)

Fasten 

BASE

 with  

HEX BOLTS 

(B)

4

1

3

4

STEP 3 :  HINGE,BASE AND  LEGS INSTALLATION

Raise  cabinet  and  check  for  potential  air 

leaks at panel joints from inside.

2

3

1

H

D

B

NOTE:

 Fasten base with base tab away from the 

front  edge,  then  fasten  and  adjust  the  hinge 

before fully tightening 

HEX BOLTS 

(B)

H

5

5

H

1

2

BOTT

OM OF CABINET

Содержание Koolspace 250

Страница 1: ...1 ASSEMBLY OPERATION MANUAL 2 5 0 5 0 0 CELLAR nuvo ko o l s p ac e TM...

Страница 2: ...remes of temperature and humidity Garages attics unfinished basements laundry rooms breezeways closets bedrooms or any unventilated room In other words these units must be installed in air conditioned...

Страница 3: ...crew x 8 Hex wrench x 1 Cam x 24 x28 Cam Pin x 24 x28 Coupler hanger x 4 Hinge x 4 In Cooling Unit Box Hex Bolt Flange x 2 Panel Insulation Strip NOTE Hardware quantities for Model 500 are indicated i...

Страница 4: ...STEP 1 PANEL PREPARATION 1 PANEL EDGE J CAUTION 1 Watch for sharp staples on boxes 2 DO NOT STEP ON PANELS 3 The manual will give a recommended order to open boxes it saves time and space 2 J J J C G...

Страница 5: ...nd make sure Arrow points to outside edge Gently push down to bring panels together before you tighten the Cam Start with cams at each end Cam Arrow faces away from outside edge when tightened STEP 2...

Страница 6: ...EFULLY aligning edge holes over Cam Pins and gently push together to avoid damaging cam pins DO NOT BANG OR SLAP PANELS TOGETHER Insert Cam push all the way in under panel level may require some force...

Страница 7: ...ASE has to be set with end tabs away from front edge Fasten BASE with HEX BOLTS B 4 1 3 4 STEP 3 HINGE BASE AND LEGS INSTALLATION Raise cabinet and check for potential air leaks at panel joints from i...

Страница 8: ...on one side Push the SHELVES down to snap into op posite side hangers 3 3 1 2 PRESS BOTTOM TOP 1 2 Install COUPLER SHELVES between the VERTICAL COUPLER and the BACK PANEL hook them on the COUPLER HANG...

Страница 9: ...ange holes Make sure unit is level 1 I D NOTE If unit is operated according to specifications overflows will not occur Excess condensation is only caused by extreme conditions Unit will shut off at 72...

Страница 10: ...N 4 Insert LIGHT COVER to holes pre drilled on front edge of TOP panel 2 Plug cord to LIGHTS and 1 Remove plastic CAP at right end for only LIGHT DO NOT remove CAP from LIGHT CAP 1 LIGHT 2 LIGHT 1 2 3...

Страница 11: ...6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 4 4 3 3 4 4 4 Install TOP HINGES with HEX BOLTS B NOTE STEP 7 DOORS INSTALLATION Insert DOORS onto BOTTOM HINGES 1 2 1 B D 2 Adjust final position of the door before ti...

Страница 12: ...l blink alternating with the temperature reading This function is disabled in the first 4 hours Cool Down period or after any reset for another 4 hours The unit will restart and continue the cooling a...

Страница 13: ...ars are illustrated below Note the variations in shelf height to accommodate the widest variety of bottle types and sizes Standard Burgundy and Bordeaux bottles are best arranged with necks facing out...

Страница 14: ...e power supply operational Is the LED display functional Is there any evidence of shipping damage on the cooling unit or packaging materials Note that the unit has a 1 minute cautionary delay between...

Страница 15: ...cifically regular cleaning of the condensor coil and fans Also you must take steps to protect the unit from sudden power surges As with any sensitive electronic device your Koolspace unit may be damag...

Страница 16: ...16 Toll free 1 888 274 8813 www koolspace com 2 5 0 5 0 0 CELLAR nuvo ko o l s p ac e TM...

Отзывы: