Important Safety Information

The content in this document must be followed in order to ensure safe operation of Nuvation
BMS™.

Do 

NOT

 energize the system until all connections to the Cell Interface and

Power Interface modules have been made.

Insulated handling is required of any connector carrying potentials over
600Vdc relative to chassis.

Properly insulate or remove any unused wires. Unused wires can couple
excessive system noise into Nuvation BMS which can disrupt
communication and lead to undesirable behaviors.

Please be aware of high voltages present in your system and follow all
necessary safety precautions.

The provided module enclosures are not fire enclosures.

Depending on battery chemistry, there might be a nominal voltage per cell
which adds up in series and is always present. There are many different
battery chemistries with different current capacities, and so high voltage
with high current capacity may be present while connecting the Nuvation
BMS. You must use proper electrical safety precautions when handling any
part of the Nuvation BMS. Neither Nuvation Energy or any of its employees
shall be liable for any direct, indirect, incidental, special, exemplary,
personal or consequential harm or damages (including, but not limited to,
procurement or substitute goods or services; loss of use, data, or profits; or
business interruption) however caused and on any theory of liability,
whether in contract, strict liability, or tort (including negligence or
otherwise) arising in any way out of the use of this product.

The Nuvation BMS relies on your system charger to charge the battery
cells; do not leave your charger off while the Nuvation BMS is powered from
the stack for prolonged periods of time. The Nuvation BMS should be shut
down when the system is in storage to minimize the drain on the cells.

Installation Guide - 2018-10-08, Rev. 2.0

1

Содержание BMS Grid Battery Controller

Страница 1: ...Installation Guide Nuvation BMS Grid Battery Controller 2018 10 08 Rev 2 0 Copyright 2018 Nuvation Energy ...

Страница 2: ...fety Information 1 1 Introduction 2 1 1 About this Guide 2 2 System Overview 3 3 Grid Battery Controller 5 3 1 Overview 5 3 2 Mechanical Dimensions 5 3 3 Electrical Connections 7 3 3 1 DC Power Connector 7 3 4 Network Connections 8 ...

Страница 3: ...y chemistries with different current capacities and so high voltage with high current capacity may be present while connecting the Nuvation BMS You must use proper electrical safety precautions when handling any part of the Nuvation BMS Neither Nuvation Energy or any of its employees shall be liable for any direct indirect incidental special exemplary personal or consequential harm or damages incl...

Страница 4: ...antage of the highly configurable browser based user interface and custom tune Nuvation BMS Grid Battery Controller to your specific target application 1 1 About this Guide This Installation Guide Nuvation BMS Grid Battery Controller provides instructions to connect your Nuvation BMS Grid Battery Controller to your Nuvation BMS Once you have successfully completed the installation process please f...

Страница 5: ...oltage Stack Controller or Nuvation BMS Low Voltage Battery Controller Figure 1 Example Nuvation BMS multi stack configuration Depending on the system the individual stacks will be managed by either a Nuvation High Voltage BMS or a Nuvation BMS Low Voltage Battery Controller The Grid Battery Controller aggregates information from each of the Stack Controllers or Battery Controllers in the system a...

Страница 6: ...Figure 2 Example single stack managed by a Stack Controller and connected to a Grid Battery Controller Installation Guide 2018 10 08 Rev 2 0 4 ...

Страница 7: ... for voltages temperature and currents Current limiting algorithms for multi stack battery systems State of Charge algorithms for multi stack battery systems NTP client for BMS time synchronization The Grid Battery Controller uses a Linux based operating system with special provisions in place to guarantee the performance and responsiveness required for real time inverter control 3 2 Mechanical Di...

Страница 8: ...Figure 3 Grid Battery Controller DIN Clip Location Installation Guide 2018 10 08 Rev 2 0 6 ...

Страница 9: ...or 3 3 1 DC Power Connector The DC power connector provides a nominal 24VDC to the Grid Battery Controller but will tolerate an input voltage between 19 2V and 28 8V At 24V it consumes no more than 2 5A The external supply has its negative input connected to earth ground through the Grid Battery Controller s chassis Installation Guide 2018 10 08 Rev 2 0 7 ...

Страница 10: ...networks The ETH2 port connects to the external network The external network provides services such as DHCP and NTP for the Grid Battery Controller An external contoller or integration software would communicate to the Grid Battery Controller over this network The ETH1 port connects the Grid Battery Controller to its internal network The internal network allows the Grid Battery Controller to conne...

Страница 11: ... time Nuvation Energy will make updates to the Nuvation BMS in response to changes in available technologies client requests emerging energy storage standards and other industry requirements The product specifications in this document therefore are subject to change without notice Copyright 2018 Nuvation Energy Installation Guide 2018 10 08 Rev 2 0 9 ...

Отзывы: