Nuvair Champion LP
NUVAIR rev.010512
Champion LP Operation Manual
Page 12
If any information in this manual conflicts with any of the other manuals call Nuvair before proceeding.
8.0
Theory of Operation:
Before Starting the Nuvair Champion LP system:
9.0 Assembly Preparation
:
1. First familiarize yourself with the components of the system in the first section of the manual.
2. Please read and follow instructions for compressor and motor provided in additional manuals.
3. Unpack the System and remove from the pallet.
4. Visually inspect the system to make sure there has been no damage* during shipping.
5. Follow the remaining step by step instructions for initial set up and operation.
*If damaged, please call Nuvair to file a damage report. Please take photos and supply detailed
information about the damage.
10.0 Set-up and Assembly
10.1 Power Connection:
This package comes with a 12 volt battery for the Diesel electric start to function properly
.
Red Is Positive!
Connecting the wrong leads may damage circuitry.
Electric Option:
A WEG 5hp electric motor is supplied with the current and voltage specified at time of purchase.
The system must be properly wired according to national and local electrical
codes by a qualified electrician. Improper wiring may lead to fires, which can
cause serious personal injury or death.
10.2 Proper Rotation:
When the Weg electric motor is used to drive the system it is important that the power supply is
properly connected to prevent improper motor rotation. Running the compressor in the wrong
direction will damage the compressor and void warranty.
A. Yanmar or Kohler Engine Operation:
See engine Manual
B. WEG or Baldor Motor Operation:
See WEG Motor Manual and Electrical Schematic on page 30 of this manual.