26
MOUNTING THE POWER UNIT
Carefully remove debris pail from power unit. Make sure bag
is properly installed in power unit (if need be). Remove the
installation kit and securely reinstall debris pail.
Refer to illustration below to maintain minimum walls and
floor clearance dimensions.
Position and install the wall mounting bracket with the
provided screws. Refer to illustration at right for proper
mounting dimensions.
Use the provided mounting screws to secure the mounting
bracket on the wall through upper and lower mounting
holes.
Hang power unit onto wall mounting bracket. Ensure
the back brackets of the power unit are engaged with
corresponding wall bracket fingers (or top fingers and lower
tab for PP5501 model; see figure below). Pull the power unit
down to secure
POWER UNIT INSTALLATION (
CONT
'
D
)
18” minimum
above floor
12” minimum
from ceiling
12”
minimum
TOP VIEW
FRONT VIEW
MINIMUM CLEARANCE DIMENSIONS
12”
minimum
AD0039A
CAUTION
Ensure to screw the wall mounting bracket directly
to a wall stud for a solid installation.
C
L
3/4” TYP.
32
7
/
8
”
1” TYP.
45¼”
MIN.
HEIGHT
18 ¹/
8
”
18 ¹/
8
”
UPPER
MOUNTING
HOLES
LOWER
MOUNTING
HOLES
AD0079A
AD0074
PP6501 & PP7001
PP5501