
7
INSTALLATION IN NEW CONSTRUCTION
WALL INLET ROUGH-IN
Once the locations for the wall inlets have been determined, mount all inlet brackets.
Choose the appropriate mounting bracket for the inlet being installed. (See chart below.)
R
OUGH
-
IN
S
ERIES
395
396-3
CI3301RK
CI3303RK
CF329
CF361
CF361F
CI399RK
W
ALL
V
AL
VE
S
ERIES
330
X
X
X
360
X
X
X
X
CI358
Rough-in and wall valve sold together
CI399
X
To locate a bracket on a wall stud, measure approximately 18" up from finished floor level. (Height may vary according to
individual
preference.)
MODELS CF361 & CF361F
(F
OR
U
SE
WITH
360 I
NLET
)
Refer to figure below. Nail bracket to the side of the stud so
that the front edge of the bracket is flush to the front of the
stud. (The bracket may also be nailed to the front edge of
the stud. See face mounting illustrated. For face mounting,
use locating tabs on bracket for proper alignment.)
Refer to figure below. Remove cardboard from plaster guard
frame. Using four (4) provided screws, attach the appropriate
flanged fitting and inlet seal to back of inlet.
Replace cardboard in plaster guard frame
MODELS CF329 (F
OR
U
SE
WITH
330 I
NLETS
)
When using Model CF329, glue elbow to
mounting plate. Attach to stud as shown in
figure at right.
SIDE
MOUNTING
FACE
MOUNTING
MODEL CF361 & CF361F
2
3
/
8
"
1
13
/
16
"
AD0059A
AD0060
AD0015