background image

INSTALLATION IN A 
NEW CONSTRUCTION SITE

PREPARATION

Refer to Figure 1.

1. To remove blower/power unit assembly from housing:

A. Unplug power unit.
B. Remove screw (located next to plug-in receptacle)

which holds blower/power unit mounting plate in place.
Save screw.

C. Lift mounting plate at end near the plug-in receptacle

until blower wheel clears the scroll.

D. Remove plate by pulling its tabs out of slots in housing.

Set blower/power unit aside until needed.

2. Remove one of the wiring knockout from housing.

MOUNTING THE HOUSING

Mounting Using Mounting Tabs
Refer to Figure 2.

1. Locate fan housing next to ceiling joist.
2. Use wood screws (not provided) to loosely attach 

the housing to ceiling joist through the keyhole slots 
in mounting tabs.

3. Adjust housing so that it will be flush with finished ceiling.

For the grille to fit properly, housing’s rim must not extend
beyond finished ceiling surface.

4. When housing is properly adjusted, tighten screws in slots.

Mounting Using Hanger Bars
(Hanger bars sold separately, order model HB4)
Refer to Figure 3.

1. Insert hanger bars in slots provided in housing.
2. Locate fan housing between joists so that the bottom of the

housing is even with the planned finished ceiling. Extend
the hanger bars to the joists.

3. Use screws or nails (not provided) to secure hanger bars

to ceiling joists.

INSTALLING THE DUCTWORK

1. 

Refer to Figure 2.

Place duct collar over flanges at

discharge opening of fan. Secure collar by snapping 
tabs into slots in flanges.

2. Run 4" round duct from outside to fan's discharge opening.
3. Connect duct to fan's duct collar.

WIRING

All wiring must comply with local codes and unit must 

be properly grounded.

1. Run 120vAC house wiring (with ground) from wall switch 

to fan location.

2. Pull wire through access hole and into junction box.
3. 

Refer to Figure 4.

Use approved wire nuts to connect

house supply wires to fixture wires as follows: white to
white; black to black. Connect green or bare ground wire 
to green ground lead.

POWER/BLOWER UNIT INSTALLATION

1. Place power/blower unit into housing so that mounting

plate's tabs insert into slots in housing.

2. Press other end of mounting plate down until it is firmly

seated over scroll and plug-in receptacles.

3. Secure mounting plate to housing with provided screw.
4. Insert motor plug into junction box receptacle.

FIGURE 2

FIGURE 3

FIGURE 4

DUCT
COLLAR

FLANGES

WIRING
KNOCKOUTS

MOUNTING
TABS

JUNCTION BOX

GREEN
GROUND
LEAD

SWITCH
BOX

EARTH GROUND

120vAC, 60 Hz
HOUSE POWER

STANDARD WALL SWITCH
(NOT INCLUDED) OR
OPTIONAL NUTONE
SPEED CONTROL

HANGER BARS 
(SOLD SEPARATELY)

Содержание 8814R

Страница 1: ...r hidden utilities D Ducted fans must always be vented to the outdoors E If this unit is to be installed over a tub or shower it must be marked as appropriate for the application F NEVER place a switc...

Страница 2: ...he planned finished ceiling Extend the hanger bars to the joists 3 Use screws or nails not provided to secure hanger bars to ceiling joists INSTALLING THE DUCTWORK 1 Refer to Figure 2 Place duct colla...

Страница 3: ...or b any products or parts which have been subject to misuse negligence accident improper maintenance or repair other than by NuTone faulty installation or installation contrary to recommended instal...

Страница 4: ...D Les ventilateurs avec gaine doivent toujours avoir une une vacuation ext rieure E Si cette unit doit tre install au dessus d une baignoire ou d une douche une stipulation sp cifique pour cette util...

Страница 5: ...ontage plac es sur le bord inf rieur du bo tier Clouer une barre aux solives 3 Coulisser le bo tier l endroit voulu entre les solives et clouer alors la seconde barre aux solives REMARQUE Le bo tier n...

Страница 6: ...l entretien et le service courants ni b les produits et les pi ces ayant fait l objet d un usage abusif de n gligence d un accident d un entretien ou d une r paration non appropri e par du personnel...

Страница 7: ...da como apropiada para la aplicaci n F No coloque NUNCA un interruptor donde pueda ser alcanzado desde la ba era o ducha ADVERTENCIA Para reducir el riesgo de incendio o choque el ctrico no utilice es...

Страница 8: ...taje en las ranuras provistas en el bastidor 2 Posicione el bastidor del ventilador entre las vigas de manera que la parte inferior del bastidor est al mismo nivel con el techo terminado planificado E...

Страница 9: ...S O A LOS TUBOS FLUORESCENTES FILTROS DUCTOS TAPAS DE TECHO TAPAS DE PARED Y OTROS ACCESORIOS PARA CANALIZACI N Esta garant a no cubre a Mantenimiento y servicios normales b Productos o partes sujetos...

Страница 10: ...86933 000 5 51919 BLOWER WHEEL 51919 000 6 63007 PUSH NUT 63007 000 7 30652 DUCT ADAPTER ASSEMBLY 30652 000 8 44208 GRILLE SPRING ASSEMBLY 44208 000 9 10034 RECEPTACLE 10034 000 EFFECTIVE DATE PRODUC...

Отзывы: