Operating Instruction and Documentation
SPL 4000
- 24 -
After the construction of the lift has been changed (changing the lifting height or
capacity for example) and after serious maintenance works (welding on carrying
parts) an extraordinary security check must be performed by an expert.
This manual contains form with a schedule for the security checks. Please us the adequate form
for the security checks. The form should remain in this manual after they have been filled out. In
the following there is a short description about special safety devices.
9 Installation and Initiation
9.1 Regulations for the installation
• The installation of the lift is performed by trained technicians of the manufacturer or its
distribution partner. If the operator can provide trained mechanics, he can install the lift by
himself. The installation has to be done according to this regulation.
• The standard lift must not be installed in hazardous locations or washing areas.
• Before installation a sufficient foundation must be proved or constructed.
An even installation place has to be provided. The foundations must be based in a frost
resistance depth, both outside and indoors, where you must reckon with frost.
• An standard electrical supply 3~/N+PE, 400 V, 50 Hz has to be provided. The supply line
must be protected with T16A (VDE0100 German regulation). The minimum diameter
amounts to 2,5 mm². (Pay attention to the tension of your state)
• All cable ducts have to be equipped with protective coverings to prevent accidents.
• After assembly of the lift, the protective grounding of the lift must be examined after
International Electronical Commission (IEC) guidelines (60364-6-61) before first start-up by
operators. Also an insulation resistance examination is recommended.
9.2 Erection and doweling of the lift
•
Install the lift according to the data sheet and the foundation plan and line it up.
•
Put both synchronising ropes over the rolls at the top and insert them from the upper
side in column. (see pic. 3). Attention: The ropes must not be crossed!
• Connect hydraulic hose between the two columns. Don’t fix connection at opposite
side too tight and don’t fasten the connection. Be sure that hydraulic hose doesn’t
hinder the course of the synchronising ropes.
• Put traverse topside on columns and fix it with enclosed cylinder screws and washers.
• The hydraulic cylinders of the opposite side was filled with oil. Before the working
with the lift, connect the plastic tube at the cylinder-ground and at the tank. Connect
the oil-return line (synthetic material) afterwards at both columns (see pic. 3)
• Check the position of the lift again.
• Bore holes to fix the dowels through the borings of the base plates. Clean holes with
pressure air. Put in safety dowels with washers in borings. The manufacturer
Содержание SPL 4000
Страница 9: ...Operating Instruction and Documentation SPL 4000 9 2 5 Attestation of conformity...
Страница 11: ...Operating Instruction and Documentation SPL 4000 11 3 3 Data sheet 4090 mm with extension...
Страница 12: ...Operating Instruction and Documentation SPL 4000 12 3 3 1 Data sheet 3650 mm...
Страница 13: ...Operating Instruction and Documentation SPL 4000 13 3 4 Foundation diagram 200mm...
Страница 14: ...Operating Instruction and Documentation SPL 4000 14 3 5 Electrical diagram drawing Standard 3x400V...
Страница 16: ...Operating Instruction and Documentation SPL 4000 16...