JUMBO 7000 HFK SCISSOR
Nussbaum Automotive Solutions, LP | 1932 Jordache Court, Gastonia, NC 28052 | 704.864.2470 | Email:
21
Always keep the lift area free of bystanders and
objects whenever raising or lowering the lift.
•
Position each runway on the appropriate “inner platform line”
(determined in Fig. 6) and on either the” front or rear platform
lines” (
determined in Fig. 5)
•
Measure between platforms for ensure there is 31½” (800mm
)
(Fig. 11)
•
Locate left and right bottom hose covers. A cutout in each side
will correspond to the hydraulic hoses on each platform. Attach
each to “U” bracket located on the inner front side of each
platform with appropriate machine screw and nut. (Figure 12)
•
Notice “T” fittings in Figure 1
0. Loosen very slightly and point
hoses towards control station and retighten.
•
Check mating surfaces between platform baseplate and the
concrete floor. There must be continuous contact between the
baseplates and the floor. If not, shims or high-strength grout
must be used.
•
Recheck alignment of platforms with layout lines established
earlier. Check for squareness of platforms by cross measuring
between front left and right rear inner corners and then front
right and left rear inner corners. (Figs. 13 & 14) Both
measurements must be identical if the platforms are square.
Figure 13
Figure 14
Figure 11
Figure 12