Operating instructions and documentation
4.50H/ 4.50H plus
- 40 -
choice of the dowel length with floor pavement or tile surface
Liebig-dowels
Dowel type
BM10-15/70/65 BM10-15/70/100 BM10-15/70/140
Drilling depth
a
85
85
85
Min. anchorage depth
b
70
70
70
Thickness of concrete
c
min.140(*)
min.140(*)
min.140(*)
Diameter of bore
d
15
15
15
Thickness of the lift-pieces
e
40-65
65-100
100-140
Number of dowels
x
x
x
Starting torque
40 Nm
40Nm
40Nm
(*) minimum thickness of concrete by using the mentioned dowels. Otherwise,
observe the regulation of the foundation plan.
You can use equivalent dowels from another dowel manufacturer (with license) but
observe their regulation.
Содержание 4.50H
Страница 9: ...Operating instructions and documentation 4 50H 4 50H plus 9 2 5 Declaration of conformity...
Страница 11: ...Operating instructions and documentation 4 50H 4 50H plus 11 3 3 Datasheet...
Страница 12: ...Operating instructions and documentation 4 50H 4 50H plus 12...
Страница 15: ...Operating instructions and documentation 4 50H 4 50H plus 15 3 6 Hydraulic diagram with wheel free jack...
Страница 17: ...Operating instructions and documentation 4 50H 4 50H plus 17 3 7 Electrical diagram w o wheel free jack...
Страница 19: ...Operating instructions and documentation 4 50H 4 50H plus 19 3 8 Electrical diagram with wheel free jack...
Страница 22: ...Operating instructions and documentation 4 50H 4 50H plus 22 Einspeisung supply Bild 2 N L3 L2 L1 PE...