Operating Instruction and Documentation
4.50 SL
- 51 -
A foundation must be constructed in accordance with the data sheet “foundation plan”. It must
be paid attention of an even installation place of the lift because of a straight contact between
lift and concrete floor.
pic 20:
dowel position
1: column
2: base plate
3: dowel
• Concrete has long chemical perspiration, which favour the corrosion at the base plates.
We recommended to provide the surface with a 2 components Epoxitharz floor coating,
before fastening the lift.
• Bore the holes to position the dowels through the bore holes of the base plates (pic.20).
Clean the holes with pressure air. Insert the dowels. The lift manufacturer demands e.g.
Liebig safety dowels or equal dowels of other manufacturer (with licence) but observe the
regulation. (bore hole, torque...).. Before doweling check the concrete floor with quality
C20/25(B25) if the concrete floor goes to the top edge of the floor. In this case the dowels
have to be chosen in according to the description (Dowels without tiles, floor pavement). If
the ground is covered with floor tiles, the dowels have to be chosen according to description
(Dowels with tiles, floor pavement). Observe the table of FISCHER Dowel manufacturer, too.
• Examine the lining up of the columns with spirit level.
• If necessary put thin metal sheets between the base plate and the floor until the lift is in the
correct vertical position and the contact between the base plate and the floor is available.
• Tighten the dowels with the dynamometric key. Observe the regulations of the dowel
manufacturer.
Each dowel must be tightened with the demanded torque. Otherwise the normal function
of the lift can not guaranteed.
• If the dowel is tightened with the demanded torque, the curved washer lies flat on the base
plate. A safe dowel connection is guaranteed.
8.2 Initiation
Before the initiation a security check must be carried out. Therefore use the form: First
security check.
If the lift is installed by a competent person, he or she is to perform the security check. If the
operator installs the lift by him or herself, he or she must instruct a competent person to
perform the security check.
The competent confirms the faultless function of the lift in the installation record and the form
for the security check and authorises the use of the lift.
Please send the completed installation record to the manufacturer after installation.
8.3 Change of lift location
If the place of installation shall be changed, the new place has to be prepared in according to
the regulations of the first installation. The changing should be performed in accordance with
the following points:
Содержание 4.50 SL
Страница 9: ...Operating Instruction and Documentation 4 50 SL 9 2 5 Declaration of conformity...
Страница 10: ...Operating Instruction and Documentation 4 50 SL 10 3 Technical Information...
Страница 12: ...Operating Instruction and Documentation 4 50 SL 12 3 3 Data sheet...
Страница 13: ...Operating Instruction and Documentation 4 50 SL 13 3 4 Foundation diagram drawing...
Страница 14: ...Operating Instruction and Documentation 4 50 SL 14 3 5 Electrical diagram drawing...
Страница 15: ...Operating Instruction and Documentation 4 50 SL 15...
Страница 16: ...Operating Instruction and Documentation 4 50 SL 16...
Страница 17: ...Operating Instruction and Documentation 4 50 SL 17...
Страница 18: ...Operating Instruction and Documentation 4 50 SL 18...
Страница 19: ...Operating Instruction and Documentation 4 50 SL 19...
Страница 20: ...Operating Instruction and Documentation 4 50 SL 20...
Страница 21: ...Operating Instruction and Documentation 4 50 SL 21...
Страница 22: ...Operating Instruction and Documentation 4 50 SL 22...
Страница 23: ...Operating Instruction and Documentation 4 50 SL 23...
Страница 24: ...Operating Instruction and Documentation 4 50 SL 24...
Страница 25: ...Operating Instruction and Documentation 4 50 SL 25...
Страница 26: ...Operating Instruction and Documentation 4 50 SL 26...
Страница 27: ...Operating Instruction and Documentation 4 50 SL 27...
Страница 28: ...Operating Instruction and Documentation 4 50 SL 28...
Страница 29: ...Operating Instruction and Documentation 4 50 SL 29...
Страница 30: ...Operating Instruction and Documentation 4 50 SL 30...
Страница 31: ...Operating Instruction and Documentation 4 50 SL 31...
Страница 32: ...Operating Instruction and Documentation 4 50 SL 32...
Страница 33: ...Operating Instruction and Documentation 4 50 SL 33...
Страница 34: ...Operating Instruction and Documentation 4 50 SL 34...
Страница 35: ...Operating Instruction and Documentation 4 50 SL 35...
Страница 36: ...Operating Instruction and Documentation 4 50 SL 36...
Страница 37: ...Operating Instruction and Documentation 4 50 SL 37...