Operating Instruction and Documentation
4.50 SL
- 49 -
pic 18: carrying nut
7.5 Examine of the stability of the automotive lift
•
Examine the dowels with a torque key as described by the dowel manufacturer. Observe the
declaration of the dowel manufacturer.
8. Installation and Initiation
pic 18:
8.1
Regulations
• The installation of the lift is performed by trained technicians of the manufacturer or one of its
distribution partners. If the operator can provide trained mechanics, he or she can install the lift
by him or herself. The installation has to be done according to this regulation.
• Installing the standard-automotive lift in a hazardous location or a washing bay is not allowed.
• Before installation a sufficient foundation must be constructed. If the foundation is already
constructed then proof that the foundation conforms to the standard is required.
A level foundation for the installation is required. The foundations must be based in a frost
resistance depth, both outdoors and indoors in a position where the installer believes there is
no chance of frost.
• An standard electrical supply 3~/N+PE, 400 V, 50 Hz must be provided. Observe the electrical
power supply of your country.
The supply line must be protected with a time-lag fuse T32A (VDE0100 German regulation).
The minimum diameter amounts to 2.5 mm².
• All cable ducts must be equipped with protective coverings to prevent accidents.
• After assembly of the lift, the protective grounding of the lift must be examined after
International Electronical Commission (IEC) guidelines (60364-6-61) before first start-up by
operators. Also an insulation resistance examination is recommended.
Содержание 4.50 SL
Страница 9: ...Operating Instruction and Documentation 4 50 SL 9 2 5 Declaration of conformity...
Страница 10: ...Operating Instruction and Documentation 4 50 SL 10 3 Technical Information...
Страница 12: ...Operating Instruction and Documentation 4 50 SL 12 3 3 Data sheet...
Страница 13: ...Operating Instruction and Documentation 4 50 SL 13 3 4 Foundation diagram drawing...
Страница 14: ...Operating Instruction and Documentation 4 50 SL 14 3 5 Electrical diagram drawing...
Страница 15: ...Operating Instruction and Documentation 4 50 SL 15...
Страница 16: ...Operating Instruction and Documentation 4 50 SL 16...
Страница 17: ...Operating Instruction and Documentation 4 50 SL 17...
Страница 18: ...Operating Instruction and Documentation 4 50 SL 18...
Страница 19: ...Operating Instruction and Documentation 4 50 SL 19...
Страница 20: ...Operating Instruction and Documentation 4 50 SL 20...
Страница 21: ...Operating Instruction and Documentation 4 50 SL 21...
Страница 22: ...Operating Instruction and Documentation 4 50 SL 22...
Страница 23: ...Operating Instruction and Documentation 4 50 SL 23...
Страница 24: ...Operating Instruction and Documentation 4 50 SL 24...
Страница 25: ...Operating Instruction and Documentation 4 50 SL 25...
Страница 26: ...Operating Instruction and Documentation 4 50 SL 26...
Страница 27: ...Operating Instruction and Documentation 4 50 SL 27...
Страница 28: ...Operating Instruction and Documentation 4 50 SL 28...
Страница 29: ...Operating Instruction and Documentation 4 50 SL 29...
Страница 30: ...Operating Instruction and Documentation 4 50 SL 30...
Страница 31: ...Operating Instruction and Documentation 4 50 SL 31...
Страница 32: ...Operating Instruction and Documentation 4 50 SL 32...
Страница 33: ...Operating Instruction and Documentation 4 50 SL 33...
Страница 34: ...Operating Instruction and Documentation 4 50 SL 34...
Страница 35: ...Operating Instruction and Documentation 4 50 SL 35...
Страница 36: ...Operating Instruction and Documentation 4 50 SL 36...
Страница 37: ...Operating Instruction and Documentation 4 50 SL 37...