Operating Instruction and Documentation
2.35 TSK
- 10 -
3.Technical Information
3.1 Technical ratings
Capacity:
3500
kg
Load distribution:
max. 2:1 in or against the drive on
direction
Lifting
time:
approx.
25
sec.
with
load
Lowering
time:
approx.
30
sec.
with
load
Lifting
height: max:
1920mm
Line voltage: 400
V
three
phase
current
Power rating:
3 kW
Motor
speed: 2800
min-1
Pump
capacity:
4,3
cm
3
Hydraulic
pressure: approx.
240
bar
Pressure
relief
valve:
approx.
260
bar
Oil
tank:
approx.
16
Litre
-
viscosity
32
cst.
Sound level L
PA
≤
70 dB
Connection
by
customer
(Observe
the
current
voltage
of your Country)
3.2 Safety device
1. Safety ratchet (only versions with external hydraulic unit)
safety device against unintentional lowering
2. Pressure relief valve
Protects the hydraulic system from exceedingly high pressures.
3. Hydraulically unlocking holding valve
safety device against unintentional lowering
4. Lockable main switch
safety device against unauthorized operation
5. CE-Stop
safety device against squeeze
6. Locking safety system at the lifting arms
safety device against unintentional horizontal moving of the arms
Содержание 2.35 TSK
Страница 9: ...Operating Instruction and Documentation 2 35 TSK 9 2 5 Declaration of conformity...
Страница 11: ...Operating Instruction and Documentation 2 35 TSK 11 3 3 Data sheet...
Страница 12: ...Operating Instruction and Documentation 2 35 TSK 12 3 4 Foundation diagram drawing...
Страница 13: ...Operating Instruction and Documentation 2 35 TSK 13 3 5 Hydraulic diagram drawing...
Страница 14: ...Operating Instruction and Documentation 2 35 TSK 14 3 6 Electrical diagram drawing...
Страница 15: ...Operating Instruction and Documentation 2 35 TSK 15...
Страница 16: ...Operating Instruction and Documentation 2 35 TSK 16...
Страница 17: ...Operating Instruction and Documentation 2 35 TSK 17...