If the control is rotated to aid connection of cables, please ensure that 
sufficient flexibility is provided in the final connection run.

To avoid conflict with the unit access panels, it is recommended 
that electrical and plumbing service connections to the unit are run 
at 90 degrees to the main air flow axis.

Control circuit connections must be segregated (i.e. routed separately) 
from power connections.

The unit rating label shows the maximum electrical load of the 
equipment. Connections to the unit may include single phase supply 
connections, and a variety of control circuits.

Only the prepared apertures in the unit casing may be used for cable 
entry. Do not drill or cut the unit casing for this purpose.

The equipment must be earthed and earth-bonded. Means of local 
isolation for maintenance purposes are generally required (by others). 
Ensure that all mains connections are isolated.

Heat recovery components and modules that incorporate cooling 
coils may produce condensation during use. An insulated drip tray and 
condensate pump is provided.  The drain connection must be connected 
to a suitable drainage point (Figures 10 & 11).

6.1 Condensate Pump

The condensate pump incorporates an alarm function. If the water 
level in the condensate tray exceeds a maximum level (for example, as 
a result of the discharge tube becoming blocked or frozen), the alarm 
contact will open. This contact is internally connected to the heat 
exchanger bypass actuator, and the unit will automatically be placed 
into bypass mode, preventing further condensate production. Unit 
operation will otherwise be unaffected.

Maximum flow rate = 12 l/h 
Maximum head = 20m Vertical, 100m Horizontal 
Pipe Connection size (Condensate) XBOXER XBC = 8 mm

6.2 Pre-Commissioning

Not all of the components listed here are necessarily included with 
the equipment supplied. 

10 

Customer Connections (Control Side of Horizontal Unit)

LPHW or electric heater

supply connections

Control box

Access to condensate

tray and pump

Condensate drain 

connection Ø 8mm push-fit

6.2.1 Filters

Remove filter access panels (observe and note airflow direction labels), 
inspect filters for contamination with construction debris, replace as 
necessary. Replace access panels. 

Filter pressure drops will depend on actual flow rate and condition. 
Observe and record filter pressure drops after performance 
commissioning. Typically, filter “dirty” condition occurs when the initial 
filter “clean” readings have been increased by 125Pa.

If filter manometers, pressure switches or indicators have been fitted, 
they should be set or adjusted to reflect the commissioned system 
operation.

11 

Customer Connections (Control Side of Vertical Unit)

LPHW or electric heater

supply connections

Control box

Access to condensate

tray and pump

Condensate drain 
connection 
Ø 8mm push-fit

Fixed panel for

customer connections

6.2.2 Heating Coils LPHW

Observe the Flow and Return connection labels on the unit. Drain and 
bleed valves are located on the coil. Other valves may be required in the 
system pipe-work depending on the installation (by others).

Where the wet system is at risk of frost damage, the addition of a 
proprietary anti-freeze solution to the water is recommended. Note 
that any frost protection offered by the unit’s integral control system 
will not operate if the power supply to the unit is interrupted.

Ecosmart frost protection is activated on any Ecosmart unit fitted with 
LPHW heating, when the outlet air temperature is 4ºC or below. The 
unit reacts by shutting down the fan to prevent a ‘wind chill’ effect 
reducing the temperature to a point whereby the coil could freeze 
and burst. The unit will also drive open the LPHW valve to a fully open 
position to allow full water flow through the coil and the main PCB 
will close the ‘Heat demand’ contacts. These contacts could be used to 
send a signal to activate the boiler and/or valve to open to provide heat 
if not already doing so.

Piped connections should be made to the unit using appropriate 
techniques, and all pipework must be independently supported. No hot 
work is permitted within one metre of the unit.

Ensure that installed pipework runs do not prevent or restrict access to 
the unit at any point.

The completed installation (including the connections within the unit, 
as these may be disturbed during installation) shall be pressure tested 
to the project engineer’s specification (

This is a condition of the unit 

warranty). 

6.2.3 Electric Heaters

Heater Capacity:   XBC75 – 3ph, 12Kw 
 

 

XBC85 – 3ph, 18Kw

The Electric Heater requires a 3ph supply which is independent from 
the main unit supply. Connections to be made through the low level 
fixed panel. The Electric Heater may be withdrawn to allow access to 
the Heater Controller without the need for wiring to be disconnected 
(Ensure the mains supply is isolated before removing any access panels 
and any adjustments are made to the Heater Controller).

Содержание XBC75

Страница 1: ...PARTS This unit contains fast moving rotational parts which may start automatically It is the sole responsibility of the installer to adequately guard these components REFER TO INSTRUCTION MANUAL Rea...

Страница 2: ...ttenuator Length 900 900mm 6 Unit Roof No Suffix Standard Unit No Roof WP Twin Pitched Roof Factory Fitted 3 0 DELIVERY 3 1 Receiving Equipment All equipment is inspected prior to despatch and leaves...

Страница 3: ...ensions mm and Weights kg Includes unit and 76mm high base frame Unit Code Unit Dimensions mm Control Dimensions mm Unit Weight kg Packed Weight kg A B C J K M E F G XBC75 H 2800 2126 876 940 740 940...

Страница 4: ...ion Dimensions mm Weight kg Width Height Length 4 XBC75 H MD24V Motorised dampers 24V for Horizontal XBC75 Adapt Siemens AS control units 620 560 165 14 4 XBC85 H MD24V Motorised dampers 24V for Horiz...

Страница 5: ...and Weights kg Unit Code Unit Dimensions mm Control Dimensions mm Unit Weights Packed Weights A B C J F H W D kg kg XBC75 H 2500 954 1416 610 894 60 954 2500 630 730 XBC85 H 3000 1000 1676 940 740 65...

Страница 6: ...Weight kg Width Height Length 4 XBC75 V MD24V Motorised dampers 24V for Vertical XBC75 units with Adapt Siemens AS control 620 560 165 14 4 XBC85 V MD24V Motorised dampers 24V for Vertical XBC85 unit...

Страница 7: ...ttery 5 2 Vertical Units e g XBC75 V XBC85 V 8 Vertical Unit Access All access panels are located on one side of the fan unit Note Unit must be isolated before panels are removed 9 Vertical Unit Overv...

Страница 8: ...ndition Observe and record filter pressure drops after performance commissioning Typically filter dirty condition occurs when the initial filter clean readings have been increased by 125Pa If filter m...

Страница 9: ...XBC75 H MD24V Vertical XBC75 V MD24V needs to be fitted after the silencer This ensures that breakout noise levels are kept to a minimum Fully interlocking parallel blades half inch diameter electrop...

Страница 10: ...h the switch will trip When the pressure falls below this set value the switch returns to its resting position 6 4 2 Switch Wiring The cable gland is designed for cables with alternative sheath diamet...

Страница 11: ...Air Temperature Sensor D Thermal Trip Electric Heater Only E LPHW Heater LPHW Models Only F Bypass Damper Drive G Condensate Pump Alarm H Fresh Air Temperature I Extract Fan Drive Health 6 5 2 Horizo...

Страница 12: ...mer will produce an unpredictable result and is not recommended Volt free versions of the switched live signals are also available at terminals T33 T34 T35 T36 Link two contacts to activate the signal...

Страница 13: ...MP terminals blocks 19 Removing Terminal Connections 7 7 4 Fitting Jumpers Terminal blocks can be connected together to increase the number of terminals at the same potential using push in jumpers In...

Страница 14: ...cument Number 671786 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk XBC75 85 AS Control Installation Manual 7 8 Physical Layout Diagrams 7 8 1 Horizontal Units 25 Physical Layout Ho...

Страница 15: ...15 09 06 21 Document Number 671786 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk XBC75 85 AS Control Installation Manual 7 8 2 Vertical Units 26 Physical Layout Vertical Units...

Страница 16: ...ly CF83 1NA nuaire co uk XBC75 85 AS Control Installation Manual 7 9 Wiring Diagrams All inter connections between circuit boards blowers and sensors are made at the factory This diagram only shows th...

Страница 17: ...17 09 06 21 Document Number 671786 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk XBC75 85 AS Control Installation Manual 28 Wiring Diagram Electric Heater...

Страница 18: ...clockwise or anticlockwise It is recommended that the frost condition temperature is set at 4 C 8 2 Electric Frost Coils 8 2 1 Wiring The heater requires two connections the relay link up and the 400V...

Страница 19: ...or cooling options 9 8 Frost Protection Should the internal temperature of the unit fall below a value defined in the commissioning variables the control will override all heating cooling logic to ope...

Страница 20: ...ean with a soft brush or vacuum Check for signs of contamination 10 3 Annually Thoroughly inspect the unit and its components for corrosion acting immediately to treat restore any damaged areas All el...

Страница 21: ...on plate attached to the unit casing Part Number Description XBC75 V FILTERKIT XBC75 Replacement G4 Panel Filters x4 776187 XBC75 Replacement Blower Assembly x1 18kg XBC75 H FILTERKIT XBC85 Replacemen...

Страница 22: ...er and steps taken to prevent ingress of contaminants 4 0 OPERATIONAL LIMITS 4 1 It is important that the specified operational limits for the equipment are adhered to e g operational air temperature...

Страница 23: ...23 09 06 21 Document Number 671786 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk XBC75 85 AS Control Installation Manual NOTES...

Страница 24: ...24 09 06 21 Document Number 671786 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk XBC75 85 AS Control Installation Manual NOTES...

Отзывы: