background image

8

26. 01. 17. Leaflet Number 671340

Installation and Maintenance

SQURBO XBOX

To comply with EC Council Directives 98/37/EC Machinery Directive and

 

2014/30/EU

 (EMC).

To be read in conjunction with the relevant Product Documentation (see 2.1)

1.0

 

GENERAL

1.1

 

The equipment referred to in this 

Declaration of Incorporation 

is supplied by 

Nuaire to be assembled into a ventilation system which may or may not include 
additional components.

The entire system must be considered for safety purposes and it is the 

responsibility of the installer to ensure that all of the equipment is installed in 

compliance with the manufacturers recommendations and with due regard to 

current legislation and codes of practice.

2.0

 

INFORMATION SUPPLIED WITH THE EQUIPMENT

2.1

 

Each item of equipment is supplied with a set of documentation which provides 

the information required for the safe installation and maintenance of the 
equipment. This may be in the form of a Data sheet and/or Installation and 
Maintenance instruction.

2.2

 

Each unit has a rating plate attached to its outer casing.  The rating plate 

provides essential data relating to the equipment such as serial number, unit 

code and electrical data.  Any further data that may be required will be found 

in the documentation. If any item is unclear or more information is required, 

contact Nuaire.

2.3

 

Where warning labels or notices are attached to the unit the instructions given 
must be adhered to.

3.0

 

TRANSPORTATION, HANDLING AND STORAGE

3.1

 

Care must be taken at all times to prevent damage to the equipment.  Note that 
shock to the unit may result in the balance of the impeller being affected.  

3.2

 

When handling the equipment, care should be taken with corners and edges and 
that the weight distribution within the unit is considered.  Lifting gear such as 
slings or ropes must be arranged so as not to bear on the casing.

3.3

 

Equipment stored on site prior to installation should be protected from the 
weather and steps taken to prevent ingress of contaminants.

4.0

 

OPERATIONAL LIMITS

4.1

 

It is important that the specified operational limits for the equipment are 
adhered to e.g. operational air temperature, air borne contaminants and unit 
orientation.

4.2

 

Where installation accessories are supplied with the specified equipment eg.  
wall mounting brackets.  They are to be used to support the equipment only.  
Other system components must have separate provision for support.

4.3

 

Flanges and connection spigots are  provided for the purpose of joining to 
duct work systems.  They must not be used to support the ductwork.

5.0

INSTALLATION REQUIREMENTS

In addition to the particular requirements given for the individual product, the 

following general requirements should be noted.

5.1

Where access to any part of equipment which 

moves

, or can become 

electrically

live

are not prevented by the equipment panels or by fixed installation detail 

(eg ducting), then guarding to the appropriate standard must be fitted.

5.2

The electrical installation of the equipment must comply with the requirements 

of the relevant local electrical safety regulations.

5.3

For EMC all control and sensor cables should not be placed within 50mm or on 

the same metal cable tray as 230V switched live, lighting or power cables and 

any cables not intended for use with this product.

6.0

COMMISSIONING REQUIREMENTS

6.1 

General pre-commissioning checks relevant to safe operation consist of the 

following: 

Ensure that no foreign bodies are present within the fan or casing. 

Check electrical safety.  e.g. Insulation and earthing.

Check guarding of system.

Check operation of  Isolators/Controls.

Check fastenings for security.

6.2

Other commissioning requirements are given in the relevant product documentation.

7.0

OPERATIONAL REQUIREMENTS

7.1

Equipment access panels must be in place at all times during operation of the 

unit, and must be secured with the original  fastenings.

7.2

If failure of the equipment occurs or is suspected then it should be taken out of 

service until a competent person can effect repair or examination. (Note that 

certain ranges of equipment are designed to detect and compensate for fan failure).

8.0

MAINTENANCE REQUIREMENTS

8.1

Specific maintenance requirements are given in the relevant product documentation.

8.2

It is important that the correct tools are used for the various tasks required.

8.3

If the access panels are to be removed for any reason the electrical supply to the 

unit must be isolated.

8.4

A minium period of two minutes should be allowed after electrical disconnection 

before access panels are removed.  This will allow the impeller to come to rest.

NB: Care should still be taken however since airflow generated at some 

other point in the system can cause the impeller to “windmill”  even when 

power is not present.

8.5

Care should be taken when removing and storing access panels in windy 

conditions.

INFORMATION FOR SAFE INSTALLATION, OPERATION AND MAINTENANCE 

OF NUAIRE VENTILATION EQUIPMENT

DECLARATION OF INCORPORATION AND INFORMATION FOR SAFE INSTALLATION, 

OPERATION AND MAINTENANCE

We declare that the machinery named below is intended to be assembled
with other components to constitute a system of machinery.  All parts 
except for moving parts requiring the correct installation of safety guards
comply with the essential requirements of the Machinery Directive. The 
machinery shall not be put into service until the system has been 
declared to be in conformity with the provisions of the EC Machinery 
Directive.

Designation of machinery:

Supply & Extract fans with 

Heat recovery

Machinery Types:

SQURBO XBOX S1 - S6 XB 

Relevant EC Council Directives:

2006/42/EC (Machinery Directive)

Applied Harmonised Standards:

BS EN ISO 12100-1, BS EN ISO 12100-2, 
EN60204-1, BS EN ISO 9001, 
BS EN ISO 13857

Applied National Standards:

BS848 Parts 1, 2.2 and 5 

Note: All standards used were current and valid at the date of signature.

Signature of manufacture representatives:

Name:

Position:

Date:

1) C. Biggs

Technical Director

26. 07. 11

2) A. Jones

Manufacturing Director 

26. 07. 11

Содержание SQURBO XBOX

Страница 1: ...cluding all external services and controls should be installed in accordance with the appropriate authority and must conform to all governing regulations e g CDM CIBSE IEE and in strict accordance wit...

Страница 2: ...ual controls and for linking the fans together under a common control If more than 4 connections are required the junction box product code ES JB should be used see data cable installation Switch Live...

Страница 3: ...ith the instructions Please note that the total data cable length used in any system must be less than 1000m Keep the number of cable joints to a minimum to ensure the best data transmission efficienc...

Страница 4: ...ract N E L SL DP CL N RET Heat Demand Run Fault NET connections for Ecosmart devices Min Max SL run on Trickle Test 0 1 Link wire see note ES CO2 Connection BMS Input Signal 0 10V 0V Ecosmart Pwr Stan...

Страница 5: ...ted in the system The voltage tolerance is _ 125mV and is measured at the fans terminal Ventilation Cooling Heating mode mode mode Local control 0 00 OFF trickle 0 25 Speed 1 0 50 0 75 1 00 Speed 2 1...

Страница 6: ...1V fan off Alternatively connect link from V to SIG for max speed 1 10V 0V V SIG 0V Unit size S1 XB Fan wiring Two per unit and one per blower Isolator by others N L N L 230V 50Hz N L 230V 50Hz N L Is...

Страница 7: ...move covers and carefully clean out interiors as necessary Check for damage and security of components Refit covers 6 0 Replacement of Parts Should any component need replacing Nuaire keep extensive s...

Страница 8: ...to the appropriate standard must be fitted 5 2 The electrical installation of the equipment must comply with the requirements of the relevant local electrical safety regulations 5 3 For EMC all contro...

Отзывы: