Note: this unit contains two fan units and two controls.

Generally, it is recommended that the two fans are operated

together (factory default arrangement), but the fans are 

capable of independent operation if required.

5

26. 01. 17. Leaflet Number 671340

Installation and Maintenance

SQURBO XBOX

Figure 9.

MIN 

=  Minimum speed adjustment

MAX 

=  Maximum speed adjustment

SL Run on 

=  Switched Live Run-On 

    Timer adjustment

TRICKLE 

=  Selects trickle running:  

    0 = off,  1 = selected

TEST 

=  Test button

LED indicators

Min         Max    SL run on

Trickle

Test

0

1

Pwr

Standby

Fan 1

Fan 2

Heating

Cooling

Fault

Frost

TX

RX

Connector

Ecosmart

3.0 Setting to Work

Using the Test Button

The test button allows the individual blowers within the unit to

be checked for its operation. If the fan is running already, press

the button once to stop the fan, press again to switch on the

fan. 

Note that the fan will return to normal operation after 

30 seconds.

LED Indication

PWR

GREEN: Power on & OK,   

Standby

LED on when fan is not running.

Fan 1

GREEN: Fan 1 is running, RED: Fan 1 faulty.

Fan 2

GREEN: Fan 2 is running, RED: Fan 2 faulty.

Heating*

GREEN: Heating selected RED: Heating faulty.

Cooling*

Not applicable. See note.

Fault

LED on when a fault is present on unit.

Frost*

Not applicable. See note.

TX

LED on when the controller is transmitting data.

RX

LED on when the controller is receiving data.

* Note that the control panel is common to all the Ecosmart

products and will have indicators for functions that are not

available in this particular fan. However these indicators

will not be illuminated.

BMS Input Signals

The system’s response to a 0-10V dc BMS signal is given in the 

following table. 

Note the BMS signal will override any sensors and user

control connected in the system. The voltage tolerance is

+/_ 125mV and is measured at the fans terminal.

Ventilation

Cooling

Heating

mode

mode*

mode*

Local control 0.00

-

-

OFF / trickle 0.25

-

-

Speed 1

0.50

0.75

1.00

Speed 2

1.50

1.75

2.00

Speed 3

2.50

2.75

3.00

Speed 4

3.50

3.75

4.00

Speed 5

4.50

4.75

5.00

Speed 6

5.50

5.75

6.00

Speed 7

6.50

6.75

7.00

Speed 8

7.50

7.75

8.00

Speed 9

8.50

8.75

9.00

Speed 10

9.50

9.75

10.00

* Only available on relevant unit

Settings

Setting the maximum air flow

ii) Ensure the power supply is switched off and that a link wire

is connected from the supply L to the SL terminal. Unplug all

items connected to the ‘Net‘ connectors.

ii) Switch on the power supply.

iii) Wait for the fan to complete its self-test operation.

Measure the airflow using standard commissioning instruments

at a suitable point in the ductwork. If adjustment is required,

rotate the pot marked ‘MAX’ to obtain the desired airflow.

Setting the minimum trickle airflow (nominal 40%)

i) Repeat the same procedure as for maximum airflow above

but without the link wire between supply L and SL terminal.

Ensure the trickle switch is in the ‘ON’ position. Adjustment

must be made on the pot marked ‘Min’.

ii) Note that the minimum setting (nominally 40%) must be

below the maximum setting, otherwise minimum setting will

be automatically set to be the same as the maximum.

Setting the overrun time

A switched live of 100-230V at terminal SL will activate the

fan. When the switched live signal is removed the fan will 

overrun for period set by the dial ‘SL run on’ - adjust the

desired overrun time by rotating clockwise.

Setting the trickle ventilation facility

Slide the ‘trickle’ switch 0 = Off, 1 = On. With ’trickle’ on and

power to unit the fan will run at minimum speed until the

switch live signal activates it to boost.

Setting the ‘air off’ temperature

The adjustment knob is located in the control pack and must 

be set to the desired ‘air off’ temperature.

Содержание SQURBO XBOX

Страница 1: ...cluding all external services and controls should be installed in accordance with the appropriate authority and must conform to all governing regulations e g CDM CIBSE IEE and in strict accordance wit...

Страница 2: ...ual controls and for linking the fans together under a common control If more than 4 connections are required the junction box product code ES JB should be used see data cable installation Switch Live...

Страница 3: ...ith the instructions Please note that the total data cable length used in any system must be less than 1000m Keep the number of cable joints to a minimum to ensure the best data transmission efficienc...

Страница 4: ...ract N E L SL DP CL N RET Heat Demand Run Fault NET connections for Ecosmart devices Min Max SL run on Trickle Test 0 1 Link wire see note ES CO2 Connection BMS Input Signal 0 10V 0V Ecosmart Pwr Stan...

Страница 5: ...ted in the system The voltage tolerance is _ 125mV and is measured at the fans terminal Ventilation Cooling Heating mode mode mode Local control 0 00 OFF trickle 0 25 Speed 1 0 50 0 75 1 00 Speed 2 1...

Страница 6: ...1V fan off Alternatively connect link from V to SIG for max speed 1 10V 0V V SIG 0V Unit size S1 XB Fan wiring Two per unit and one per blower Isolator by others N L N L 230V 50Hz N L 230V 50Hz N L Is...

Страница 7: ...move covers and carefully clean out interiors as necessary Check for damage and security of components Refit covers 6 0 Replacement of Parts Should any component need replacing Nuaire keep extensive s...

Страница 8: ...to the appropriate standard must be fitted 5 2 The electrical installation of the equipment must comply with the requirements of the relevant local electrical safety regulations 5 3 For EMC all contro...