
OM0252
|
Rev 4 May/2020
Page 11 of 59
NuAire, Inc.
|
2100 Fernbrook Lane
|
Plymouth, MN 55447
|
U.S.A
|
ph: 763.553.1270
|
fx: 763.553.0459
|
tf: 800.328.3352
5.2.2 Preparation of rotor and accessories
The rotor and the 4 buckets may have been packed inside the centrifuge in order to reduce the volume of packing
material. However, before any utilization, make sure to remove the packing foam before turning the unit on for the
first time.
These packing foams allow the rotor to be centered inside the bowl without any constraint or forces applied directly
on the motor shaft or without damaging any internal part in the bowl.
5.2.3 Description
1.
Lid
2.
Window
3.
Control panel
4.
Electronic warhead
5.
Main switch
6.
Cooling unit (refrigerated model only)
7.
Electrical outlet
1.
Insert the allen wrench in the hole on the left side panel to manually
open the centrifuge
2.
Turn it clockwise until the lid opens up
3.
Remove the allen wrench from the hole
4.
Remove all the packing foam inside the bowl
5.
Remove the buckets and put them on a table next to the centrifuge
6.
Remove the rotor with both hands and put it on a table
(it shouldn’t be locked on the shaft) next to the centrifuge
7.
Remove all the different layers of packing foam
8.
If needed, clean the bowl if any residual packing material or dust is
sitting at the bottom
1. Insert the release key into the hole in the front
2.Turn down until the lid opens up
3.Remove the key from the hole
4. Remove all the packing foam inside the bowl
5. Remove the buckets and put them on a table next to the centrifuge
6. Remove the rotor with both hands and put it on a table
(it shouldn’t be locked on the shaft) next to the centrifuge
7. Remove all the different layers of packing foam
8. If needed, clean the bowl if any residual packing material or dust is
sitting at the bottom
1
2
3
2
1
3
2
1
3
5
4
7
6