NuAire DE1-ES Скачать руководство пользователя страница 2

2

22. 02. 22. Document Number  611280

Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk

DAVE Extract (DE)

Installation Manual

1.2 Important Information

This manual contains important information on the safe and 
appropriate assembly, transport, commissioning, operation, 
maintenance, disassembly and simple troubleshooting of the product.

While the product has been manufactured according to the accepted 
rules of current technology, there is still a danger of personal injury or 
damage to equipment if the following general safety instructions and 
the warnings contained in these instructions are not complied with.

Read these instructions completely and thoroughly before 
working with the product.

Keep these instructions in a location where they are accessible 
to all users at all times.

Always include the operating instructions when you pass the 
product on to third parties.

1.3 Personal Protective Equipment

The following minimum Personal Protective Equipment (PPE) is 
recommended when interacting with Nuaire product:

Protective Steel Toed Shoes - 

when handling heavy objects.

 

Full Finger Gloves (Marigold PU800 or equivalent) - 

when 

handling sheet metal components. 

Semi Fingerless Gloves (Marigold PU3000 3DO or equivalent) 

- when conducting light work on the unit requiring tactile 
dexterity. 

Safety Glasses

 - when conducting any cleaning/cutting operation 

or exchanging filters. 

Reusable Half Mask Respirators 

- when replacing filters which 

have been in contact with normal room or environmental air.

Nuaire would always recommend a site specific risk assessment by a 
competent person to determine if any additional PPE is required. 

2.0 INTRODUCTION

The Dave range of in-line backward curve fans consists of 9 sizes 
with a maximum duty of 1.1m3/s (1100l/s).

Units are manufactured from aluzinc, rectangular in section and have 
circular rigid spigots at each end. All units are supplied with fixing 
brackets designed to simplify installation.

2.1 Code Description: 

1

2

3

4

-

5

DE

2

HA

ES

-

H

1. Range:  

 

DE 

=

 

DAVE EXTRACT FAN

2. Unit Size:  

 

1 - 7

3. Fan / Case Type:   

No Reference

 = Standard Fan / Case

  

 

  A 

= Extended Case (Includes G3 Filter) 

  

 

H

 = High Pressure Fan (Size 2 & 4 only) 

  

 

HA

 = High Pressure Fan (Size 2 & 4 only) 

 

 

 

with Extended Case (Includes G3 Filter)

4. Control:

  

ES 

= Ecosmart

5. Electrical Frequency: 

No Reference = 

50Hz 

  

 

H =

 60Hz

3.0 DELIVERY & RECEIPT OF EQUIPMENT 

All equipment is inspected prior to despatch and leaves the factory in 
good condition. Upon receipt of the equipment an inspection should be 
made and any damage indicated on the delivery note.

Particulars of damage and/or incomplete delivery should be endorsed 
by the driver delivering the goods before offloading by the purchaser.

No responsibility will be accepted for damage sustained during the 
offloading from the vehicle or on the site thereafter.

All claims for damage and/or incomplete delivery must be reported to 
Nuaire within two days of receipt of the equipment.

3.1 Offloading & Handling 

The weight of the unit modules and palletised items are displayed on 
the packaging.

Some of the modules have an uneven weight distribution, and this will 
be indicated by labelling where appropriate.

Offloading and positioning of the equipment is the responsibility of 
the purchaser. Items should only be lifted by competent personnel 
following appropriate risk assessment.

Assembly with

base frame

Palletised

Forklift

Slings via spreaders fitted to unit
with base frame.

Please note that above images are
examples of typical lifting methods.
Actual unit lifting plan and risks
must be assessed by competent 
personnel before moving the unit.

Typical Loading Methods

Содержание DE1-ES

Страница 1: ...rminating close to the fan must be adequately protected by suitable guards This appliance should not be used by children or persons with reduced physical sensory or mental capabilities or lack of expe...

Страница 2: ...ans consists of 9 sizes with a maximum duty of 1 1m3 s 1100l s Units are manufactured from aluzinc rectangular in section and have circular rigid spigots at each end All units are supplied with fixing...

Страница 3: ...H 1004 567 237 150 370 150 100 960 609 30 DE2A ES H 1004 703 304 200 370 150 100 960 746 40 DE2HA ES H 1004 703 304 200 370 150 100 960 746 45 DE3A ES H 1004 788 349 200 370 150 100 960 830 50 DE4A ES...

Страница 4: ...Unit Details Unit details including Full Load Current Voltage fan speed etc can be found on the unit label 6 2 Wiring Diagrams Local isolator by others All inter connections between circuit boards bl...

Страница 5: ...same conduit as the mains cables and ensure there is a 50mm separation between the data cable and other cables The maximum cable run between any two devices is 300m when it is installed in accordance...

Страница 6: ...0 Only available on relevant unit 7 0 MAINTENANCE Isolation Before commencing work make sure that the unit and Nuaire control are electrically isolated from the mains supply It is important that maint...

Страница 7: ...elines taking into account all site based risks Where possible Nuaire use components which can be largely recycled when the product reaches its end of life Fans motors controls actuators cabling and o...

Страница 8: ...and steps taken to prevent ingress of contaminants 4 0 OPERATIONAL LIMITS 4 1 It is important that the specified operational limits for the equipment are adhered to e g operational air temperature air...

Отзывы: