Nuaire Group MRXBOX95B-LOFT Скачать руководство пользователя страница 8

8

Leaflet Number 671453 January 2011

Installation and Maintenance

MRXBOX95B-LOFT Mechanical Ventilation with Heat Recovery & Summer Bypass

Western Industrial Estate  

Caerphilly  United Kingdom  

CF83 1NA  

T: 029 2088 5911   

F: 029 2088 7033 

E: [email protected]   

W: www.nuaire.co.uk

Technical or commercial considerations may, from time to time, make it necessary to alter the design, performance and 

dimensions of equipment and the right is reserved to make such changes without prior notice.

Содержание MRXBOX95B-LOFT

Страница 1: ...t the four L shape fixing brackets to the unit with the M4 screws provided they can be attached to the long or short sides of the unit depending on requirements Each pair of brackets should be mounted...

Страница 2: ...of 90 Deg bends be kept to a minimum 5 Ducting joints must be sealed with duct tape and or silicone sealant For further information refer to Building Regulations Part F and BRE appendix Q website Any...

Страница 3: ...n alternative position 125mm dia spigot Alternative 150mm dia spigot 3 alternative 150mm dia spigots on back of unit 3 0 Dimensions mm Figure 4 Main unit components shown with front and lid removed G4...

Страница 4: ...other cables 4 0 Electrical Connection Please note the electrical connection of the unit must be be carried out by a qualified electrician The unit is supplied with a flexible cord for connection to t...

Страница 5: ...ata Cable installation A 4 core data cable is used to connect devices such as sensors to the fan and for interconnecting multiple fan units Do not run data cable in the same conduit as the mains cable...

Страница 6: ...years Generally check for damage and security of components Refit top cover 3 Inspecting motors Motors can be accessed through removal side panels 8 0 Replacement of Parts Should any component need r...

Страница 7: ...hange speed This is normal and will have no adverse effect on the fan The speed will return to normal once the interference has subsided 5 0 INSTALLATION REQUIREMENTS In addition to the particular req...

Страница 8: ...estern Industrial Estate Caerphilly United Kingdom CF83 1NA T 029 2088 5911 F 029 2088 7033 E info nuaire co uk W www nuaire co uk Technical or commercial considerations may from time to time make it...

Отзывы: