background image

 

MGN 2800N 
Gas Burner 

 

Installation & Maintenance 

Manual 

 
 
 

Содержание MGN 2800N

Страница 1: ...MGN 2800N Gas Burner Installation Maintenance Manual...

Страница 2: ...u way has the largest range of commercial spares available to the market Our Spares sales team collectively have more than 170 years employment with Nu way and are therefore more than experienced in o...

Страница 3: ...High Gas Pressure Switch 9 Low Gas Pressure Switch 9 Gas Valve Train 9 ELECTRICAL DATA TABLE 9 WIELAND PLUG SOCKET CONNECTIONS 10 Air Gas Ratio Controller 11 Valve Proving Systems 11 Landis Staefa LD...

Страница 4: ...ner Motor Only Runs Continuously 24 Replacement Of Air Gas Ratio Controller 24 Incorrect Rotation Of Burner Motor 24 Motor Fan Removal 24 SERVICE REPLACEMENT 24 BURNER HEAD DETAILS 25 BURNER PERFORMAN...

Страница 5: ...MGN 2800N HP 4 BURNER COMPONENT IDENTIFICATION 1 8 15 4 6 17 13 2 3 16 7...

Страница 6: ...Burner Flame Tube 12 Valve Proving Pressure Switches 4 Combustion Fan Motor 13 Electrical Connection Box 5 Combustion Air Inlet 14 Valve Proving Control Box 6 Combustion Air Damper Motor 15 Pilot Gas...

Страница 7: ...ons to be fulfilled and the controls and adjustments to be used are dealt with in the sequence that should be followed for the correct assembly installation and use Pre commissioning and Commissioning...

Страница 8: ...rol Package Hinged Extension and Flame Tube Assembly b Gas train complete Mode Two Comprising Three Units a Burner Body complete with Control Package b Gas Train Complete c Hinged Extension and Flame...

Страница 9: ...gs All connecting pipework should be well supported and accurately positioned in order to avoid stressing the booster casing The use of flexible connectors which reduce both pipework stresses and tran...

Страница 10: ...ted and pre wired to the gas train to ensure that if the gas pressure at the burner head increases above the gas pressure at maximum continuous running then the burner will shut down to a safe conditi...

Страница 11: ...Burner Operating Hours Run Counter P2 Burner High Flame Hours Run Counter S1 Supply On Off Switch 1 2 3 B4 S3 T2 T1 N L1 T8 T7 T6 B5 3 PHASE FUSED ISOLATED SUPPLY 1 PHASE FUSED ISOLATED SUPPLY P1 H2 H...

Страница 12: ...ystem then opens V3 in the start gas line and then closes it after 2 seconds b V1 V2 and V3 remain closed for 23 seconds while the minimum side of the gas pressure switch PS checks for an increase in...

Страница 13: ...KP75 SKP15 Item Description 1 Main Safety Valve SKP15 2 Combined Valve Regulator SKP75 3 Pilot Solenoid Valve 4 Pilot Gas Governor 5 High Gas Pressure Switch 6 Burner Connection Flange 7 Low Gas Press...

Страница 14: ...EW AIR DAMPER MOTORS H L 9 8 7 6 5 4 3 2 1 N Berger Lahr STM 30 B2 Berger Lahr STM 30 Q5 Note The fully closed cam is factory set and under normal circumstances should not require further adjustment O...

Страница 15: ...scale at the end of the cam stack serves as a position indicator The air damper assembly can be rotated manually by disconnecting from the drive motor using the lever A The cams should be adjusted by...

Страница 16: ...anel is fitted to the rear left hand side of the burner fan casing The panel is of the fully enclosed type containing the fan motor starter relays burner sequence control RWF40 modulating controller A...

Страница 17: ...will not enter the controller but run back into the combustion chamber If necessary a water separator must be provided EMERGENCY INSTRUCTIONS This product has been designed and constructed to meet al...

Страница 18: ...emblies are fully tested for function and valve security before despatch A soundness test of the gas valve is difficult without specialised pressure testing equipment However the following check can b...

Страница 19: ...er on and allow it to establish low flame Gradually open the upstream manual valve to the fully open position keeping a watchful eye on the CO level If the CO content is excessive adjust the low fire...

Страница 20: ...al Switch off the burner Remove the control panel cover and disconnect the flame signal check link Connect a DC microammeter Refer only to the wiring diagram appropriate to the control fitted on the b...

Страница 21: ...electrical supply The burner will now operate until switched off a by controlling instruments of the appliance b manually c by power failure On restoration of power the burner will restart automatica...

Страница 22: ...pted A value can only be altered within the permitted range of that parameter All other parameters must remain as supplied Note The detector range parameters SCL and SCH are given as C for Hot Water t...

Страница 23: ...er runs through its start cycle c Re tighten the screw in the pressure test point and reset the lockout button on the valve proving system ROUTINE MAINTENANCE Switch off electrical supply and gas supp...

Страница 24: ...erminals Satronic TMG 740 Terminals 17 16 Landis Staefa LFL 1 3 Terminals 4 13 If the air pressure switch is not in the start position turn the setting dial clockwise If no continuity is obtained the...

Страница 25: ...e any two phases In normal circumstances this will correct the rotation Motor Fan Removal Should the motor or combustion air fan need replacing the following procedure can be followed Disconnect the g...

Страница 26: ...0 4 5 6 1 2 3 11 9 7 10 8 255 234 Projection Item Description Item Description 1 Gas Nozzle 7 Diffuser Mounting Stud 2 Flame Tube 8 Diffuser Plate 3 Pilot Gas Tube 9 Gas Train Adaptor 4 Inner Assembly...

Страница 27: ...inimum gas supply pressure is obtained by summing the combustion chamber resistance and combined burner head and line loss shown as solid lines A further 2 5 mbar should be added to allow for manufact...

Страница 28: ...Type Size Serial No Burner Type Size Serial No Commissioning date Guarantee Expiry date Gas type Gas Pressure upstream of main gas governor a Standing mbar b Running mbar Gas pressure at burner head m...

Страница 29: ...MGN 2800N HP 28 BURNER SERVICE RECORD The details below are to be completed by the Servicing Engineer DATE DETAILS OF MODIFICATION...

Страница 30: ...MGN 2800N HP 29 BURNER SERVICE RECORD The details below are to be completed by the Servicing Engineer DATE DETAILS OF MODIFICATION...

Страница 31: ......

Страница 32: ...Enertech Limited P O Box 1 Vines Lane Droitwich Worcestershire WR9 8NA tel 44 0 1905 794331 fax 44 0 1905 794017 email info nu way co uk web www nu way co uk...

Отзывы: