background image

Asphalt and concrete cutters 

Operation manual 

Page 

16 

issued 01/2017 

4.2.  Operation 

4.2.1.  Selection of the Cutting Disc

 
For  safe  and  efficient  operation,  right  selection 
of the cutting disc is highly important. Choose a 
high-quality 

diamond 

cutting 

disc 

and 

appropriate type depending on the material to be 
cut (asphalt, concrete). 
Cutting  discs  of  most  suppliers  are  divided  in 
quality 

categories 

(standard/profi 

etc.), 

sometimes  also  according  to  length  and  height 
of the diamond segments, spacing, etc. 
Cutting disc diameter is to be selected according 
to  the  type  of  the  machine;  if  possible,  choose 
always  the  maximal  allowed  diameter  (RZ  120 
350 mm, RZ 170 450 mm). The spindle speed is 
adjusted  for  this  size  to  keep  optimal 
circumferential  cutting  speed  of  the  disc.

 

4.2.2.  Fastening of the Cutting Disc

1.  Turn off the engine and open the disc cover.  
2.  Use  the  enclosed  wrenches  to  hold  the 

spindle  and  unscrew  the  fastening  nut. 
NOTE: Left thread!  

3.  Fit the cutting disc on the spindle and secure 

it.  

4.  Close the disc cover and secure it. 

 

 

4.2.3.  Cutting 

1.  Have  the  disc  raised  above  floor.  Start  the 

engine and set full throttle.  

2.  Open the water tap to engage sprinkling.  
3.  Move  the  machine  to  the  beginning  of  the 

cut.  

4.  Lower  slowly  the  disc  into  the  cut,  till 

required cutting depth is reached.  

5.  Sensitively  push  the  machine  forward  and 

follow the marked path (use the guide).  

6.  The  machine  can  only  cut  in  straight 

direction.  In  case  the  direction  must  be 

changed,  raise  the  disc  from  the  cut,  take 
new direction and lower the disc again.  

7.  At  the  end  of  the  cut,  raise  the  disc,  set the 

throttle to idle. 

NOTE!  The  cutting  disc  should  be  sprinkled 
all  the  time.  Follow  the  water  level  in  the 
tank and timely add water as necessary. Dry 
cutting may cause fast damage to the disc.  

Содержание RZ120

Страница 1: ...E CUTTERS RZ120 RZ170 RZ200 RZ120B RZ170B RZ200B RZ120S RZ170S RZ200S version 01 2017 NTC STAVEBNÍ TECHNIKA spol s r o Jiřinková 120 552 03 Česká Skalice Czech Republic Tel 420 491 452 184 fax 420 491 401 609 E mail ntc ntc cz www ntc cz ...

Страница 2: ...wer GX270 6 3 kW GX390 8 72kW BRIGGS and STRATTON net power 1450 SERIES 7 3 kW 2100 SERIES 9 1kW SUBARU net power EX27 5 1 kW EX40 7 kW Všechna příslušná ustanovení Strojní zařízení směrnice 2006 42 ES NV č 176 2008 Sb která výrobek splňuje Machinery Directive 2006 42 EC The product meets all relevent provisions Emise hluku směrnice 2000 14 ES NV č 9 2002 Sb Noise Emission 2000 14 EC Elektromagnet...

Страница 3: ...nia and Russia NTC has certified quality control system according to ISO 9001 2008 All manufactured models undergo testing measuring and consideration of safety risks all machines conform to safety standards and bear the CE mark CONTENT 1 SAFETY INSTRUCTIONS 5 1 1 GENERAL INSTRUCTIONS FOR OPERATION OF LIGHT CONSTRUCTION EQUIPMENT 5 1 1 1 Requirements for qualification of the operator 5 1 1 2 Contr...

Страница 4: ... Crane 17 4 4 3 Handling by Forklift 17 4 4 4 Transport 17 4 4 5 Storing 17 4 5 SPECIAL CONDITIONS OF OPERATION 17 4 5 1 Work at Low Temperatures 17 4 5 2 Work at High Altitudes 18 4 5 3 Work in Dusty Environment 18 5 MAINTENANCE 18 BOLTED CONNECTIONS TO THE LOOP CONTROL OF DEPTH OF CUT AND THE MATRIX ARM OF INSTRUCTION AT RZ 120 170 ARE GLUED SCREW WITH A PULLEY THE DRIVE CHASSIS ARE TIGHT AND PR...

Страница 5: ...ure safe working conditions inspect attendance of the safety regulations inspect that the operator works with the machine in accordance with the Operation Manual ensure regular inspections maintenance and repairs of the machine store the Operation Manual so that it is readily available arrange suitable safe and adequate storing of the machine when not in use The contractor is also responsible for ...

Страница 6: ...le 14 Do not smoke do not use naked flame Do not work close to flammables or in explosion danger areas 15 Avoid touching hot parts The exhaust silencer and other parts of the engine are very hot during operation and touching them can cause serious burns 1 1 5 Maintenance and Service 1 Check the technical condition of the machine regularly mainly the protective and operation parts Arrange any possi...

Страница 7: ...ng 1 3 Hygienic principles Oil derivates fuel lubricants as well as paints and thinners are harmful agents Anyone who gets into contact with such agents is obliged to protect himself and follow general principles health protection as well as to follow instructions valid for each specific agent Pay special care to skin care wash hands properly after finishing the work and apply suitable cream Store...

Страница 8: ...d by NV no 9 2002 Coll Annex no 3 section B paragraph 31 respectively in accordance with Directive 2000 14 ES Annex III Part B item 30 and EN ISO 3744 2010 99 4 101 4 101 4 103 4 107 4 107 4 102 4 107 4 107 4 Acceleration transferred to hands ahvd m sec 2 Measured according to EN 13862 A1 Annex F under load and EN ISO 20643 10 42 4 17 5 22 2 09 5 22 2 09 10 42 4 17 5 22 2 09 5 22 2 09 10 42 4 17 5...

Страница 9: ...ion Symbol no 7 28 orders the operator to read the manual prior to starting the operation Safety mark symbol no NB 2 26 orders the operator to use protective gloves during the operation to reduce vibrations Safety mark symbol no B 3 1 exclamation mark warns the operator from the danger risk Information for the operator regarding repair cleaning or adjusting the machine 2 Symbol no 7 23 according t...

Страница 10: ...TECHNICAL DESCRIPTION The asphalt and concrete cutters RZ are intended for cutting of asphalt and concrete floors or road layers when repairing roads industrial areas etc The machine is based on a rigid frame with fixed spindle the cutting disc is lowered to the cut together with the whole frame Lowering and rising of the cutting disc is controlled by means of a arrested handle that enables fine r...

Страница 11: ...waterless kg 95 106 110 105 111 111 103 113 113 Dimensions L x W x H mm 1060x550x960 1060x550x960 1060x550x960 1060x550x960 1060x550x960 1060x550x960 1060x550x960 1060x550x960 1060x550x960 Engine HONDA GX270 HONDA GX390 HONDA GX390 BRIGGS STRATTON 1450 SERIES BRIGGS STRATTON 2100SERIES BRIGGS STRATTON 2100SERIES SUBARU EX27 SUBARU EX40 SUBARU EX40 Nominal power kW 6 3 8 7 8 7 7 35 9 93 9 93 6 6 10...

Страница 12: ...owing specifications 10W 30 API SJ CF engine oil HONDA GX270 approx 1 1 ltr HONDA GX390 approx 1 1 ltr BRIGGS STRATTON 1450 SERIES approx 1 1 ltr BRIGGS STRATTON 2100 SERIES approx 1 1 ltr SUBARU EX 27 approx 1 0 ltr SUBARU EX 40 approx 1 2 ltr Alternatively other quality oils of class SAE 10W 40 of classification API SG CF 4 API SG CE can beused ...

Страница 13: ...trix arm guidance SS 120 170 are glued Screws at the pulleys the drive chassis are tight and prescribed the query moment We therefore recommend against any potential activity associated with permitting and tightening of joints and contact information to an authorized service center or manufacturer 3 1 Check Oil Level It is highly recommended to check regularly the engine oil level even at machines...

Страница 14: ...el 1 Gasoline engines Use unleaded or leaded gasoline for motor vehicles with octane number 91 or more Top up fuel as necessary Never use dirty fuel or mixture with oil Avoid water and dust from entering the fuel tank 3 4 Check Air Filter Check the air filter for cleanness on a daily basis Clean or replace the filter if dirty Never run the machine with air filter missing or damaged Dust and dirt w...

Страница 15: ...ngine or at high ambient temperature 1 Adjust the throttle control lever to idle 5 Pull out the starter grip slowly till some resistance is felt then pull vehemently Do not release the grip but return it slowly into the original position 6 Let the engine to warm up then disengage the choke 7 Let the engine to run at idle for a while before loading 8 For cutting shift the throttle control lever to ...

Страница 16: ... the Cutting Disc 1 Turn off the engine and open the disc cover 2 Use the enclosed wrenches to hold the spindle and unscrew the fastening nut NOTE Left thread 3 Fit the cutting disc on the spindle and secure it 4 Close the disc cover and secure it 4 2 3 Cutting 1 Have the disc raised above floor Start the engine and set full throttle 2 Open the water tap to engage sprinkling 3 Move the machine to ...

Страница 17: ...e Technical Data Observe the regulations valid for operation of cranes Only qualified personnel may carry out this work Fasten the lifting cable to the marked point at the machine 4 4 3 Handling by Forklift Should be the machine extensively handled by a forklift as when sending it by a parcel service it is recommended to palletize it For one machine use small palette 0 8x0 6m for two machines stan...

Страница 18: ...extent of this Manual should be committed to an authorized service It is forbidden to intervent the engine except for standart maintenance during warranty period Bolted connections to the loop control of depth of cut and the matrix arm of instruction at RZ 120 170 are glued Screw with a pulley the drive chassis are tight and prescribed the query moment We therefore recommend against any potential ...

Страница 19: ...ded to inspect the bolted connections daily before work 5 4 Adjustment of Engine Speed In case of engine replacement or repair it is necessary to adjust engine speed Speed is measured by a digital tachometer Therefore the speed setting is recommended to entrust a qualified serviceman ...

Страница 20: ...ion Initial inspection After 1st month or 20 hrs Every 3 months or 50 hrs Every 6 months or 100 hrs Engine oil Inspection of oil level DAILY Exchange Air filter Inspection Cleaning 1 Spark plug gasoline engines Inspection cleaning Cyclone filter Cleanig 3 Filter bowl Cleaning Fuel hose Inspection Exchange Every two years Valve clearance Inspection adjustment Every 12 months or 250 hrs 2 Fuel tank ...

Страница 21: ...he machine is in warranty write date of purchase and let the serviceman know it is a warranty case 4 Warranty claim needs to be done in written form best if Warranty claim form is used 5 Every warranty claim will be checked by authorized staff immediately and the way of repair will be suggested Warranty conditions are described in the agreement with particular distributor The right for warranty ex...

Страница 22: ...e sale date Machine purchased from NTC dealer Dealer Machine owner adress phone no contact person Machine operation site if different from owner s address Please send properly filled protocol by fax e mail or post to above mentioned address you will speed the process up Accepting the warranty to be filled in by warranty dept of NTC Date of repair start Date of repair finish Internal no Signature N...

Страница 23: ... Warranty claim assessment YES NO Reason Used spare parts Part no Description Pcs Tech director sign Production director sign Finishing warranty management to be filled by warranty dept of NTC Returning the machine to owner in case of repair in NTC Arranged by Way of transport Shipment date Warranty extension Amount of days Warranty valid to Warranty solution information to owner Date Name Signatu...

Страница 24: ...Asphalt and concrete cutters Operation manual Page 24 issued 01 2017 ...

Отзывы: