
MAINTENANCE
MOTOR - The motors used on the Charger 2300BP/2500BP. require very little service. Using
compressed air, blow the entire motor every 60 days. Pay close attention to the carbon brush
area. Accumulated dirt will cause excessive carbon brush arcing, reduced brush life, poor
machine performance and possible damage.
CARBON BRUSHES - Inspect every 1000 hours of use for uneven wear and pitting. Replace carbon
brushes when they have worn to a length of 3/8". Failure to replace carbon brushes will cause
poor machine performance and possible motor damage.
WHEELS/CASTER - Every 30 days, lubricate the wheels/caster with an industrial grade bearing grease.
Failure to lubricate wheels/caster will cause the machine to maneuver with difficulty and
premature failure of the wheels/caster and bearing.
PAD PRESSURE/PIVOT LINKAGE - Every 60 days, inspect ALL connections in the pad pressure
adjustment and pivot linkage assembly. All linkage must move freely and smoothly to ensure
proper machine operation. Lubricate each part as required with small amount of grease such as
Lubricate. Failure to lubricate these components may make it impossible to adjust the pad
pressure or place machine into all three positions.
DUST CONTROL SYSTEM - Weekly, check vac hose for connection to Flexiwall Shield and filter bag.
When filter bag is more than one-half (1/2) full, dispose of old bag and replace with new bag.
Inspect flexiwall Shield for dents, cracks and wear. A damaged Flexiwall Shield will greatly
reduce the burnishing and dust control capabilities. Dirt build up on the brush should be
removed.
POLYETHYLENE BODY - Weekly, clean with “Armorall” type protector or wipe with a damp cloth.
Never Spray machine with water.
Содержание 2300BP
Страница 3: ......
Страница 4: ......
Страница 9: ...BASE ASSEMBLY ...
Страница 11: ...SHIELD AND PAD DRIVER ASSEMBLY ...
Страница 13: ...CONTROL FRAME ASSEMBLY ...
Страница 15: ...HOUSING ASSEMBLY ...
Страница 19: ...WIRING DIAGRAM ...