NRG Systems
Spidar User Manual
Rev. 3
4 November 2020
Spidar User Manual
nrgsystems.com | Page 37
8.
When powering a DC system ON, follow this order to
protect the Charge Controller:
•
1
st
- battery circuit breaker, middle.
•
2
nd
- PV circuit breaker, left
•
3
rd
- load (Spidar) circuit breaker, right
3.
Power Controller to Spidar Connections
To access the connection panel, locate it along the base of the Spidar and unscrew the four Allen screws,
using a 3mm Allen Screwdriver. This will release the cover and allow you to lower it, exposing the
connections underneath.
Figure 44: Opening Electrical Connection Panel
1st
2nd
3rd
Содержание Spidar
Страница 1: ...November 4 2020 ...