NRG Systems
Spidar User Manual
Rev. 3
4 November 2020
Spidar User Manual
nrgsystems.com | Page 36
Figure 42: Cut gasket, place wires in gasket, secure with nut
4.
Locate the AC/DC adapter cable that comes through the first strain relief port from the left and
remove the positive and negative leads from the terminal blocks. Tape the ends and secure the
wires out of the way to make room for the PV and battery leads.
5.
Wire PV leads into the first terminal block on the left (PV Input)
6.
Wire Battery leads into the middle terminal (Battery Input)
Figure 43: Wiring of battery and PV inputs (negative wire highlighted with gray arrow for contrast)
7.
Tighten strain relief and make sure everything is secure
PV
Input
+ -
Battery
Input
+ -
Note
: wires from
AC/DC converter
taped out of the
way
Содержание Spidar
Страница 1: ...November 4 2020 ...