![NRG Systems 11174 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/nrg-systems/11174/11174_instructions-manual_1714010009.webp)
NRG INSTRUCTIONS
SRA System | Soiling Measurement Kit
SRA Soiling Measurement Kit Instructions
Rev. 6.0
[email protected] | Page 9
19 December 2018
1.5: Mount the angle boom to the tower.
Disassemble the lower U-bolt assembly but leave slide nut/bolt attched through the outer bracket
(Figure 1-8).
Figure 1-8
Remove the rubber angle boom end cap and insert slide nut/bolt/bracket into channel opposite the SRA
tower. Tighten bolt slightly to keep bracket at approximately 3” from the end of the hinge (Figure 1-9).
Figure 1-9
Measure 15” down the tower from the upper U-bolt. Mark measurement with permanent marker if
desired (Figure 1-10).