![NRG Systems 11174 Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/nrg-systems/11174/11174_instructions-manual_1714010007.webp)
NRG INSTRUCTIONS
SRA System | Soiling Measurement Kit
SRA Soiling Measurement Kit Instructions
Rev. 6.0
[email protected] | Page 7
19 December 2018
1.3: Mount PV panel assembly to upper U-bolt.
If desired, remove the slide nuts and add Loctite to the threads. Allow to dry slightly, then reattach slide
nuts to the bolts, leaving them loose.
Otherwise, loosen the slide nuts on the upper U-bolt bracket so they are flush with the end of the bolts
(Figure 1-4).
Figure 1-4: Slide nuts (circled) on the upper U-bolt bracket.
Remove the PV panel assembly from the box and slide the short, hinged section of mounting rail onto
the slide nuts (Figure 1-5). Use 2 people if possible.
Figure 1-5: Mounting PV panel assembly to bracket using slide nuts.