![Novusun CNC NVCM Series Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/novusun-cnc/nvcm-series/nvcm-series_manual_1713376005.webp)
Chapter1 Intr
oduction
Manual of NVCM
- 3 -
Figure1-2.
The other side of NVCMand installation dimensions
1.4 substantival explanation
When operate the NVCM, where will be a lot of English abbreviation, now we list all .
FRO: Feeding adjust: During the operating process, the F value already set, and need to
adjust the current feeding speed, then we can adjust FRO value to realize it.
SRO: Spindle speed adjust: During the operating process, the S value already set, and need
to adjust the current spindle speed, then we can adjust SRO value to realize it :
Current Speed S#=setting S*SRO.
SRJ: speed adjust manually,During the operating process,as the manual speed already
set,and we need to adjust the current speed,and impossible to fix the value during it is
working,then we can revise the SRJ value to realize it. Current manual speed FS#=Setting
manual speed*SRJ.
F:Feedingspeed,the unit is mm/min.For example F=200,means every minute feeding
2000mm.
S: Spindle Speed. Unit is rad/min.For example S=20000,means 20000 revolution/Minute.
X axis Coordinate Y axis Coordinate
Z axis Coordinate
A axis Coordinate