© NOVATEC, Inc, 2018 All Rights Reserved 5 Document: SVP IM 7 FEB 2018
4 UNPACKING
Caution should be exercised to see that the equipment is not handled roughly. The crate
must be removed carefully. The machine must not be used to pry against Do not pry against
the machine when removing the crate. The vacuum power unit is usually shipped
completely assembled and requires no further attention prior to installation. Note any
shipping damage on delivery receipt and report immediately to trucking company.
5 GENERAL INSPECTION
When the unit is unpacked, make a visual inspection looking for missing parts or damage
that may have occurred during shipment. Report any missing parts to Novatec immediately.
All electrical and mechanical connections should be checked for tightness, as vibration
during transit may cause them to loosen.
IMPORTANT:
Before placing the vacuum pump into service, be sure oil has been put in the
pump, as oil may have been drained following factory quality control testing. See page 13 for
lubrication guidelines.
Replacement blowers are shipped without oil.