 AIR PURGING

When relocate the unit to another place, 
perform evacuation using vacuum pump.
Make sure the refrigerant added into the air 
conditioner is liquid form in any case.
(Not applicable to the units adopt freon R22 )

Open the valve stem until it hits against the 
stopper. Do not try to open it further.
Securely tighten the valve stem cap with a
spanner or the like.
Valve stem cap tightening torque (See 
Tightening torque table in previous page ).

Outdoor
unit

Indoor
unit

Refrigerant 

Flare nut

Stopper

Cap

Valve body

Packed valve

Half union

Gas side

Liquid side

A

C

D

B

Valve stem

Fig.24

Fig.25

When Using the Vacuum Pump

(For method  of using a  manifold valve, refer 
to its operation manual.)
1. Completely tighten the flare nuts, A, B, C, D, 
    connect the manifold valve charge hose to a 
    charge port of the low-pressure valve on the 
    gas pipe side.
2. Connect the charge hose connection to the 
    vacuum pump.
3. Fully open the handle Lo of the manifold valve.
4. Operate the vacuum pump to evacuate. After 
    starting evacuation, slightly loose theflare nut 
    of the Lo valve on the gas pipe side and 
    check that the air is entering(Operation noise 
    of  the vacuum pump changes and a 
    compound meter indicates 0 instead of minus)
5. After the evacuation is complete, fully close 
    the handle Lo of the manifold valve and stop 
    the operation of the vacuum pump. Make 
    evacuation for 15 minutes or more and check 
    that the compound meter indicates 

5

    -76cmHg  (-1x10 Pa).
6. Turn the stem of the packed valve B about 

o

    45  counterclockwise for 6~7 seconds after 
    the gas coming out, then tighten the flare nut 
    again. Make sure the pressure display in the 
    pressure indicator is a little higher than the 
    atmosphere pressure.
7. Remove the charge hose from the Low 
    pressure charge hose.
8. Fully open the packed valve stems B and A.
9. Securely tighten the cap of the packed valve.

Manifold valve

Compound meter

-76cmHg

Handle Lo

Handle Hi

Charge hose

Charge hose

Vacuum pump

Pressure gauge

Low pressure valve

Fig.26

   

Caution in handling the packed valve

Содержание INVENTER SPLIT-TYPE ROOM AIR CONDITIONER

Страница 1: ...completely before installing the product If the power cord is damaged replacement work shall be performed by authorised personnel only Installation work must be performed in accordance with the national wiring Standards by authorised personnel only Contact an authorised service technician for repair maintenance or installation of this unit INVENTER SPLIT TYPE ...

Страница 2: ... authorised installer for installation of this unit The air conditioner is not intended for use by young children or infirmed persons without supervision Young children should be supervised to ensure that they do not play with the air conditioner If the power cord is to be replaced replacement work shall be performed by authorised personnel only Installation work must be performed in accordance wi...

Страница 3: ...iring standard regulation and this installation instructions An independent circuit and single outlet must be used If electrical circuit capacity is not enough or defect found in electrical work it will cause electrical shock fire 6 Use the specified cable and connect tightly and clamp the cable so that no external force will be acted on the terminal If connection or fixing is not perfect it will ...

Страница 4: ...30cm The front of the unit should have more than 79in 200cm of clearance and the connection side right side should have more than 24in 60cm of clearance Do not place animals and plants in the path of the air inlet or outlet Take the air conditioner weight into account and select a place where noise and vibration will not be an issue Select a place so that the warm air and noise from the air condit...

Страница 5: ...s 1 See page 8 for details 1 8 8 1 1 1 Self tapping Screw B ST2 9X10 Remote controller Installation Plate Name of Accessories Self tapping Screw A ST3 9X25 Drain Joint Connecting pipe Assembly Number Q ty Remote controller holder Parts you must purchase A minimum pipe wall thickness of 0 7mm is required 21000Btu h 12000Btu h 12000Btu h 21000Btu h 21000Btu h Liquid side Gas side 1 2 3 4 5 6 7 8 9 5...

Страница 6: ...by a rise Do not put the end of drain hose into water Fig 7 Correct orientation of Installation Plate 18000Btu h model 18000Btu h model Left refrigerant pipe hole 3in 5in or more to wall 33 3in 1 6in 11 3in Right refrigerant pipe hole 3in Installation plate Indoor unit outline 6in or more to ceiling 5in or more to wall 1 6in 1 6in 5in or more from the wall 5in or more from the wall 2in 6in or more...

Страница 7: ...e indoor unit from side to side to see that it is securely hooked see Fig 10 Fig 11 3 Piping can easily be made by lifting the indoor unit with a cushioning material between the indoor unit and the wall Get it out after finish piping 4 Push the lower part of the indoor unit up on the wall then move the indoor unit from side to side up and down to check if it is hooked securely 4 Indoor unit instal...

Страница 8: ...ose sloped downward to drain out the condensed water smoothly CAUTION Install the outdoor unit on a rigid base to prevent increasing noise level and vibration Determine the air outlet direction where the discharged air is not blocked In the case that the installation place is exposed to strong wind such as a seaside make sure the fan operating properly by putting the unit lengthwise along the wall...

Страница 9: ...oughness Burr Main cause for refrigerant leakage is due to defect in the flaring work Carry out correct flaring work using the following procedure A Cut the pipes and the cable 1 Use the piping kit accessory or pipes purchased locally 2 Measure the distance between the indoor and the outdoor unit 3 Cut the pipes a little longer than the measured distance 4 Cut the cable 5ft 1 5m longer than the pi...

Страница 10: ...ll the air conditioner and explain to the client until the problem is solved 2 Power voltage should be in the range of 90 110 of rated voltage 3 The creepage protector and main power switch with a 1 5 times capacity of Max Current of the unit should be installed in power circuit 4 Ensure the air conditioner is grounded well 7 An individual branch circuit and single receptacle used only for this ai...

Страница 11: ...y electrical components Secure the cable onto the control board with the cord clamp Terminal block of indoor unit Fig 22 Power supply Input Rated Amp Switch Fuse 40A 30A 12000Btu h 30A 25A 12000Btu h 208 230V 60Hz To outdoor unit To outdoor unit Panel Minimum norminal cross sectional area of conductors Rated current of appliance A 3 and 6 6 and 10 10 and 16 16 and 25 Nominal cross sectional area 2...

Страница 12: ...is tightly connected Disconnecting means must be provided and shall be located within sight from and readily accessible from the air conditioner Connecting cable with conduit shall go through the hole of the conduit panel Note To prevent wires loosening or leaving the Cord Clamp please select proper cord diameter to fill the holes on the cord clamp Power supply cord Power supply 1φ 208 230V 60Hz S...

Страница 13: ...be incorporated in the fixed wiring and have an air gap contact separation of at least 3mm in each active phase conductors CAUTION CAUTION CAUTION CAUTION Air and moisture in the refrigerant system have undesirable effects as indicated below Pressure in the system rises Operating current rises Cooling or heating efficiency drops Moisture in the refrigerant circuit may freeze and block capillary tu...

Страница 14: ...Fully open the handle Lo of the manifold valve 4 Operate the vacuum pump to evacuate After starting evacuation slightly loose theflare nut of the Lo valve on the gas pipe side and check that the air is entering Operation noise of the vacuum pump changes and a compound meter indicates 0 instead of minus 5 After the evacuation is complete fully close the handle Lo of the manifold valve and stop the ...

Страница 15: ...ipes have leakage 2 Leak detector Use the leak detector to check for leakage Test running Safety and leakage check 14 TEST RUNNING Perform test operation after completing gas leak check at the flare nut connections and electrical safety check Check that all tubing and wiring have been properly connected Check that the gas and liquid side service valves are fully open 1 Connect the power press the ...

Страница 16: ...CS014I BPV1 202000100314 ...

Отзывы: