OAM&P description
Optical Multiservice Edge 6130 NT6Q92MA Rel 1.0 Iss 1 Standard September 2006
SDH Configuration
Optical Multiservice Edge 6130 Release 1.0 is a platform that can be deployed
in a SDH environment.
System Line-up and Test (SLAT)
System Line-up and Test (SLAT) is a two part process consisting of
commissioning an OME6130 network element and system testing.
Commissioning brings a newly installed OME6130 network element to an
in-service state ready to carry traffic. System testing consists of performing a
traffic continuity and performance test of the network.
Commissioning process
The commissioning process starts after completion of the installation of the
OME6130 chassis into a 19”, 21” or 23” rack, circuit packs in the aggregate
and tributary slots, service cables and optical fibers routed but not connected,
and power cables connected but power switched off.
The commissioning process can be broken down into the following phases:
•
network element powering up
In this phase, the user verifies the network element equipment and the
power supply, and then powers up the shelf.
•
network element commissioning
In this phase, the user logs in to the OME6130 network element by
connecting to the Craft port on the OAM circuit pack. The user uses the
SLAT WUI page to either restore a saved configuration onto the new
network element or manually enter the network element commissioning
data and DCN parameters.
The node capability is provisioned to either STM-1 or STM-4 during initial
commissioning from the Configure Node application. The two SFP
interfaces of the 2x155/622M aggregate circuit pack are operating at the
rate of the node capability value.
Note:
You cannot change the node capability from STM-1 to STM-4 or
vice versa while in-service. To change the node capability of the network
element, you must first use the “Restore factory default” application to
delete all configuration, events, and PM data. Power cycle the network
element and then use the Configure Node page to enter the required
commissioning information and node capability or to restore from a saved
configuration.
Содержание Optical Multiservice Edge 6130
Страница 4: ...iv Publication history Optical Multiservice Edge 6130 NT6Q92MA Rel 1 0 Iss 1 Standard September 2006 ...
Страница 142: ...7 40 Technical specifications Optical Multiservice Edge 6130 NT6Q92MA Rel 1 0 Iss 1 Standard September 2006 ...
Страница 186: ...9 6 Technical assistance Optical Multiservice Edge 6130 NT6Q92MA Rel 1 0 Iss 1 Standard September 2006 ...
Страница 291: ......