BCM450 installation preparation
19
Nortel Business Communications Manager 450 1.0
Installation — System
NN40160-301 01.04 Standard
July 2009
Copyright © 2006-2009 Nortel Networks
2
Order the required trunks from the central office.
3
Ensure that the system complies with the environmental
requirements.
4
Ensure that the system complies with the electrical requirements.
5
Ensure that the system complies with the site telephony-wiring
requirements.
--End--
Verifying the main unit components
Before you install the BCM450 main unit, verify that you have the required
components and that the components are not damaged.
Procedure steps
Step
Action
1
Open the BCM450 main unit box and remove the components.
2
Verify that you have one BCM450 main unit.
3
Verify that you have one power supply cable.
4
Verify that you have four rubber feet.
5
Verify that you have one set of rack-mount brackets.
6
Verify that you have a documentation CD.
7
Verify that you have the Installation Checklist and Quick Start Guide.
8
Visually inspect the components for damage during shipping.
9
If you find damage or if you do not have all components, contact your
Nortel sales representative.
--End--
Verifying the expansion cabinet components
Before you install the optional BCM450 expansion cabinet, verify that you
have the required components, and that they are not damaged.
Procedure steps
Step
Action