background image

24

gas flame has proven, the blower motor will slowly ramp 

up to the selected motor torque. The blower will continue 

to operate after the call for heat has been removed for 100 

seconds. 

NOTE:

 All on- and off-delays for heating continue 

to be controlled by the furnace control board.

Cooling or Heat Pump Mode

When the thermostat calls for cooling, the circuit between 

R

G

, and 

Y

 is completed. The blower slowly ramps up to 

the selected cooling motor torque.

Manual Fan

When the manual fan switch on the thermostat is on, 

(energizing G only) the blower will operate on a default 

setting of blower tap 1. Refer to 

Table 7 (page 32)

Table 

8 (page 33)

Table 9 (page 34)

, & 

Table 10 (page 35)

 

and the Continuous Fan Blower Tap Setting section below.

Selecting Continuous Fan Blower Tap Setting

NOTE:

 Power must be applied to the board or the unit can 

be functioning to change the continuous fan speed.

1. Press the MENU button, the control will show the options on 

the display. Keep pressing the MENU button,  the options 

are   Err-L6F-Cr-Cod-OdU-HOd-COF-COP-HtP-rUn.

2. Blower taps 1-9 can be selected for the continuous fan 

setting.

3. COF is the continuous fan mode blower tap setting.  While 

COF is on the LED display, press the OPTION button to 

scroll through the selections for the continuous fan blower 

tap settings.

4. Pres the OPTION button again and again to scroll through 

the continuous fan blower tap settings.  CF.1(Default), 

CF.2,CF.3, CF.4, CF.5, CF.6, CF.7, CF.8, CF.9 will show 

on the LED.  Once the desired continuous fan blower 

setting is displayed on the LED, press MENU to save the 

selection.

NOTE:

 Refer to (

Table 7 (page 32)

Table 8 (page 33)

Table 9 (page 34)

, & 

Table 10 (page 35)

) for air flow data.

Fault Conditions

There is a green and a red LED (labeled “Status”) on the 

furnace control board to provide system faults as described 

below. Refer to 

Table 6 (page 27)

 to determine motor control 

board fault conditions.

Electronic Air Cleaner (EAC)

The EAC relay is energized 5 seconds after the blower is 

running and de-energized after the blower stops.  The EAC 

has dry contacts, therefore power will need to be supplied 

to one side of the EAC terminal.

Humidifier (HUM)

The HUM relay is energized when a flame has been detected 

and the blower is running. The HUM relay is de-energized 

when no flame is detected.  The HUM has dry contacts, 

therefore power will need to be supplied to one side of the 

HUM terminal

OPERATING SEQUENCE

The operating sequences for the heating, cooling, and fan 

modes are described below. Refer to the field and furnace 

wiring diagrams: 

Figure 19 (page 20)

Figure 20 (page 20)

Figure 24 (page 36)

, and

 Figure 25 (page 37)

.

Heating Cycle

1.  The thermostat calls for heat by energizing the W terminal 

with 24VAC.

2.  The control checks the HLI input for a closed limit.

3.  The control performs a circuitry check and verifies the 

that all 3 pressure switches are open. If any pressure 

switches are closed during this check, the control will 

monitor and wait for 30 seconds for them to open. If the 

pressure switches are still closed after 30 seconds the 

LED will show error codes of 3.1 and 3.3.  If both pressure 

switches are open during this check the control will cycle 

through the next circuitry check.

4.  The control continuously monitors the gas valve circuitry 

to verify the gas valve relay and presence of voltage at 

the valve. If there is a voltage detected at the gas valve 

without a call for heat, error 7.1 will be displayed.

5.  After a successful pressure transducer circuitry check, the 

system will energize the inducer motor.  Control monitors 

the voltage from the pressure transducer but ignores low 

voltage before the inducer is activated. Once the inducer 

is activated, a voltage from the pressure transducer 

.2 volts or less is considered low and will show a 4.1 

Error code. If the voltage is between .2 and .7 volts and 

pressure switch #1 fails to close at a call for heat, Error 

3.2 is reported.

6.  Once the inducer energizes, voltage between .2 and .7 

is detected, and the-.5”WC pressure switch is detected 

closed, the inducer 30 pre-purge begins.

7.  The inducer will ramp down to 400 RPM.

8.  After the completion of the pre-purge, the control will start 

the 20 second igniter warm-up period.

9.  After completion of the ignitor warm up period, the 4 

second trial for ignition period begins.

10. The gas valve is energized. Flame failure response is 

set at (2.5 seconds).

11. The ignitor is de-energized as soon as flame is sensed, 

or at the end of the ignition activation period(IAP) of 2 

seconds.

12. When the flame is sensed , the blower heat on delay 

begins.(25s) and the inducer will start to ramp up.

13. The control will start monitoring the   -.95”WC and -2.4”WC 

pressure switches for closure.

• For the A050, the time delay to monitor the -.95”WC 

and -2.4”WC pressure switches is 20 seconds after 

flame sense.

• For the C100, the time delay to monitor the -.95”WC 

and -2.4”WC pressure switches is 31 seconds after 

flame sense.

14. When the thermostat is satisfied, the gas valve immediately 

de-energizes and the heat off delay of 100(Default) 

seconds begins.

15. The inducer output remains on for a 30 second post-purge 

period.

16. If the call for heat is lost while the control is in the trial for 

ignition period without flame being detected, the control 

will turn off the gas valve and ignitor. The control will enter 

the post purge routine of 60seconds.   After completing 

the post purge, the control will resume normal operation.

Содержание SD Ultra Low Nox Series

Страница 1: ...asoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use...

Страница 2: ...Pressure Switch Location 14 Accessories 15 Finish Flange 15 Rubber Grommets 15 PVC Components 15 Typical Orientation 15 Alternate Orientation 16 Optional PVC Pipe Installation 16 Condensate Drain Line...

Страница 3: ...tallation service and operation of this furnace Failure to follow safety recommendations could result in possible damage to the equipment serious personal injury or death This furnace must be installe...

Страница 4: ...ping Gas Pipe Pressure Testing US NFGC and National Plumbing Codes General Installation US Current edition of the NFGC and the NFPA 90B For copies contact the National Fire Protection Association Inc...

Страница 5: ...36 in Figure 1 Minimum Clearances to Combustible Materials COMBUSTION AIR VENTING REQUIREMENTS WARNING CARBON MONOXIDE POISONING HAZARD Failure to follow the steps outlined below for each appliance c...

Страница 6: ...hat force air from the house to the outdoors can create a negative pressure inside the house resulting in improper furnace operationorunsafeconditionssuchasflameroll out It is imperative that sufficie...

Страница 7: ...ces crawl or attic that freely exchange with the outdoors See Figure 3 Figure 3 Combustion Air Drawn from a Crawl Space or Vented Attic TOTAL INPUT RATING BTUH MINIMUM FREE AREA EACH OPENING ROUND DUC...

Страница 8: ...which draw combustion air from that space In general a furnace installed in an unconfined space will not requireoutsideairforcombustion However inhomesbuiltfor energy efficiency low air change rates...

Страница 9: ...ft for each additional 2 inch short radius elbow 3 5 ft for each additional 3 inch long radius elbow and 7 ft for each additional 3 inch short radius elbow Subtract 5 ft for each 2 tee and 8 ft for e...

Страница 10: ...g horizontally a side wall vent kit is available according to the pipe diameter size of the installation For 2 inch pipe use side wall vent kit 904617 and for 3 inch pipe use kit 904347 Please follow...

Страница 11: ...ustion air piping may be installed in an existing chimney which is not in use provided that Both the exhaust vent and air intake run the length of the chimney The top of the chimney is sealed and weat...

Страница 12: ...and condensing on the heat exchanger If a manually operated damper is installed it must be designed so that operation of the furnace is prevented when the damper is in the cooling position and operat...

Страница 13: ...any combustible material other than wood flooring SD series gas furnaces are shipped with the bottom panel installed as shown in Figure 23 page 31 If the furnace is installed with only side return air...

Страница 14: ...he left or right side of the furnace use the extra screw provided in the parts package 6 Remove the cabinet plug from side of furnace and reinstall in hole on opposite side of cabinet 7 Install in lin...

Страница 15: ...m the top to the bottom section of the cabinet or open grommet holes in the cabinet PVC Components IMPORTANT NOTES Before permanently installing these components it is recommended you dry fit them fir...

Страница 16: ...retighten the clamp It is permissible to locate the trap away from the furnace The condensate drain system J trap and drain tube should be no more than 30 equivalent feet while maintaining 1 4 per foo...

Страница 17: ...building immediately Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department All gas piping mus...

Страница 18: ...y omitted for clarity of pipe installation Gas Valve See Note B See Note A Plug Flexible Gas Line Flexible Gas Line FURNACE INPUT MAIN BURNER ORIFICE SIZE MAIN AIR ORIFICE DIAMETER MANIFOLD PRESSURE 5...

Страница 19: ...page 36 Figure 25 page 37 or the unit wiring label IMPORTANT NOTES An electrical disconnect must be installed readily accessible from and located within sight of the furnace See Figure 24 page 36 or...

Страница 20: ...k White Black White START UP ADJUSTMENTS Pre Start Check List Verify the polarity of the connections are correct the line voltage power leads are securely connected and the furnace is properly grounde...

Страница 21: ...possible The thermometer on the supply air side must be shielded from direct radiation from the heat exchanger to avoid false readings 2 Adjustallregistersandductdamperstothedesiredposition and run t...

Страница 22: ...ower motor is running tP is displayed following with the Tap number For instance If the blower motor has been set for Tap 4 tP4 will be displayed Ifanalarmisdetected theerrorcodedisdisplayedstarting w...

Страница 23: ...3 digit display will show 1dL which means idle Press the MENU button the control will show the options on the display Keep pressing the MENU button the options are Err L6F Cr Cod OdU HOd COF COP HtP...

Страница 24: ...36 and Figure 25 page 37 Heating Cycle 1 ThethermostatcallsforheatbyenergizingtheWterminal with 24VAC 2 The control checks the HLI input for a closed limit 3 The control performs a circuitry check an...

Страница 25: ...eady for the next call Cooling Cycle When Y1 and G or Y1 Y2 and G signals are detected the control will operate in compressor cooling mode The Electronic Air Cleaner EAC relay will energize 5 seconds...

Страница 26: ...be inspected and cleaned if required by a qualified service technician annually to ensure continued safe operation Pay attentiontoanydeteriorationfromcorrosionorothersources WARNING Holes in the vent...

Страница 27: ...ce the recycle count will start over Internal Control Fault E2 3 Internal relay in the control board has failed Replace the board Control senses 24V output to the gas valve If voltage is not sensed to...

Страница 28: ...2 Measure the pressure If the pressure is as expected replacethepressuretransducer There should not be measurable amount of pressure when furnace is idle Atacallforheatthecontrolmonitorsthepressure se...

Страница 29: ...s stuck on the board Replace the board The control senses 24V output from internal relays at all times If power is detected at the HLO output on the 12 pin plug at any time even without a call for hea...

Страница 30: ...nsate Drain Switch The Condensate Drain Switch will shut down the furnace if the condensate drain from the Collector Pan becomes clogged BlowerLimitSwitch Preventsoperationoftheblowermotor when the bl...

Страница 31: ...TTOM VIEW TOP VIEW 4 Knockouts both sides 1 LEFT SIDE RIGHT SIDE 3 1 4 Gas 1 5 8 T stat 7 8 Electric 7 8 Vent pipe 3 Cond 1 1 16 T stat 7 8 Electric 7 8 Gas 1 5 8 Condensate 1 1 16 Vent pipe 3 Combust...

Страница 32: ...0 5 CFM RISE CFM RISE CFM RISE CFM RISE CFM RISE 050U T23A 50 000 BTU Hr Input 50 000 Btuh Input Btuh Output Bottom Tap 9 Tap 8 Tap 7 Tap 6 Tap 5 970 45 935 47 915 48 880 50 845 52 Tap 4 875 50 835 53...

Страница 33: ...50 1 315 1 285 1 255 1 225 1 200 Tap 8 1 290 1 260 1 230 1 195 1 160 1 135 1 100 1 070 Tap 7 1 145 1 115 1 090 1 055 1 030 995 960 920 Tap 6 1 045 1 015 980 950 920 885 855 825 Tap 5 935 915 880 845 8...

Страница 34: ...0 Btuh Input 95 000 Btuh Output Bottom Only 9 8 7 6 1 850 48 1 790 49 1 745 50 1 700 52 1 650 53 5 1 745 50 1 690 52 1 645 53 1 590 55 1 535 57 4 1 480 59 1 420 62 1 360 65 3 2 1 Side Only 9 8 7 6 1 7...

Страница 35: ...95 1 015 945 870 790 715 665 615 1 980 905 835 740 665 590 525 440 Bottom Side 9 2 245 2 195 2 155 2 095 2 065 2 070 2 015 1 950 8 2 080 2 030 1 980 1 930 1 880 1 820 1 765 1 705 7 1 915 1 875 1 820 1...

Страница 36: ...GROUND TO CHASSIS TO CHASSIS Refer to the Installation Instructions provided with the furnace for the proper heating and cooling speeds for your application Refer to the Installation Instructions for...

Страница 37: ...R TWIN W2 W1 B C Y2 GND Y1 O R G PRESSURE TRANSDUCER GND P1 5V INDUCER PRESSURE SWITCH 1 INDUCER PRESSURE SWITCH 2 COLLECTOR SWITCH PS2 PS1 PS0 MVC HLI ILI HLO MVL GND 5A FUSE K4 TR TH K2 GAS VALVE FL...

Страница 38: ...88 375 98 37 184 367 100 36 180 360 102 35 176 353 104 35 173 346 106 34 170 340 108 33 167 333 110 33 164 327 112 32 161 321 114 32 158 316 116 31 155 310 118 31 153 305 120 30 150 300 CAPACITY OF BL...

Страница 39: ...tended above meter regulator assembly I Clearance to service regulator vent outlet J Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 6 inche...

Страница 40: ...st slope upward 1 4 per foot 5 7 90 Elbows 90 Elbow COMBUSTION AIR Straps or other suitable supports at minimum 5 ft intervals both pipes 90 Elbows Flue Pipe must slope upward 1 4 per foot First suppo...

Страница 41: ...E 2 Inline Drain Field Supplied See NOTES 2 3 Collector Box Drain Factory Equipped See NOTE 2 X See NOTE 5 X See NOTE 5 FLUE PIPE X See NOTE 5 X See NOTE 5 FLUE PIPE Inline Drain Tube Factory Supplied...

Страница 42: ...IGHT 1 PIPE OPTIONS Plug VIEW D VIEW E VIEW F VIEW G COMBUSTION AIR FLUE PIPE OPTION 7 OPTION 8 COMBUSTION AIR Rubber Grommet See VIEW D for drain line positions See VIEW E for drain line positions Pl...

Страница 43: ...d See NOTES 2 3 Collector Box Drain Factory Equipped See NOTE 2 Inline Drain Field Supplied See NOTES 2 3 Field Supplied Drain Line Attached to PVC Trap Do Not Trap COMBUSTION AIR FLUE PIPE Flange COM...

Страница 44: ...ft Installation Inducer Vertical Horizontal Left Installation Inducer Rotated Left Horizontal Right Installation Inducer Vertical Horizontal Right Installation Inducer Rotated Right Alternate Location...

Страница 45: ...lation Inducer Vertical Horizontal Left Installation Inducer Rotated Left Horizontal Right Installation Inducer Vertical Horizontal Right Installation Inducer Rotated Right Alternate Locations Alterna...

Страница 46: ...46...

Страница 47: ...47...

Страница 48: ...instructing the customer on how to operate and maintain the equipment for the life of the product Safety should always be the deciding factor when installing this product and using common sense plays...

Отзывы: