Table 11. Gas Flow Rates

GAS FLOW RATES

(CUBIC FEET PER HOUR)

TIME FOR

ONE REVOLUTION

(SECONDS)

CUBIC FEET PER

REVOLUTION OF GAS METER

1

5

10

10

360

1,800

3,600

12

300

1,500

3,000

14

257

1,286

2,571

16

225

1,125

2,250

18

200

1,000

2,000

20

180

900

1,800

22

164

818

1,636

24

150

750

1,500

26

138

692

1,385

28

129

643

1,286

30

120

600

1,200

32

113

563

1,125

34

106

529

1,059

36

100

500

1,000

38

95

474

947

40

90

450

900

42

86

429

857

44

82

409

818

46

78

391

783

48

75

375

750

50

72

360

720

52

69

346

692

54

67

333

667

56

64

321

643

58

62

310

621

60

60

300

600

62

58

290

581

64

56

281

563

GAS FLOW RATES

(CUBIC FEET PER HOUR)

TIME FOR

ONE REVOLUTION

(SECONDS)

CUBIC FEET PER

REVOLUTION OF GAS METER

1

5

10

66

55

273

545

68

53

265

529

70

51

257

514

72

50

250

500

74

49

243

486

76

47

237

474

78

46

231

462

80

45

225

450

82

44

220

439

84

43

214

429

86

42

209

419

88

41

205

409

90

40

200

400

92

39

196

391

94

38

191

383

96

38

188

375

98

37

184

367

100

36

180

360

102

35

176

353

104

35

173

346

106

34

170

340

108

33

167

333

110

33

164

327

112

32

161

321

114

32

158

316

116

31

155

310

118

31

153

305

120

30

150

300

CAPACITY OF BLACK IRON GAS PIPE (CU. FT. PER HOUR)

FOR NATURAL GAS W/ SPECIFIC GRAVITY = 0.60

NOMINAL PIPE

DIAMETER (IN.)

LENGTH OF PIPE RUN (FEET)

10

20

30

40

50

60

70

80

1/2

130

90

75

65

55

50

45

40

3/4

280 190 150 130 115 105

95

90

1

520 350 285 245 215 195 180 170

1 1/4

1,050 730 590 500 440 400 370 350

1 1/2

1,600 1,100 890 760 670 610

Cubic Feet Per Hour Required =

Input To Furnace (Btu/hr)

Heating Value of Gas (Btu/Cu. Ft.)

NOTE:

The cubic feet per hour listed in the table above must be greater than the 

cubic feet per hour of gas flow required by the furnace. To determine the 

cubic feet per hour of gas flow required by the furnace, divide the input 

rate of the furnace by the heating value (from gas supplier) of the gas. 

Table 12. Gas Pipe Capacities

LOCAL HEATING VALUES FOR NATURAL GAS

ALTITUDE

ABOVE

SEA

LEVEL 

BTU PER CUBIC FOOT

650 700 750 800 850 900 950 1,000 1,050

2,000 FT

LOW LOW LOW LOW LOW LOW HIGH HIGH HIGH

Table 13. Natural Gas Heating Values

Содержание SD Ultra Low Nox Series

Страница 1: ...asoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use...

Страница 2: ...Pressure Switch Location 14 Accessories 15 Finish Flange 15 Rubber Grommets 15 PVC Components 15 Typical Orientation 15 Alternate Orientation 16 Optional PVC Pipe Installation 16 Condensate Drain Line...

Страница 3: ...tallation service and operation of this furnace Failure to follow safety recommendations could result in possible damage to the equipment serious personal injury or death This furnace must be installe...

Страница 4: ...ping Gas Pipe Pressure Testing US NFGC and National Plumbing Codes General Installation US Current edition of the NFGC and the NFPA 90B For copies contact the National Fire Protection Association Inc...

Страница 5: ...36 in Figure 1 Minimum Clearances to Combustible Materials COMBUSTION AIR VENTING REQUIREMENTS WARNING CARBON MONOXIDE POISONING HAZARD Failure to follow the steps outlined below for each appliance c...

Страница 6: ...hat force air from the house to the outdoors can create a negative pressure inside the house resulting in improper furnace operationorunsafeconditionssuchasflameroll out It is imperative that sufficie...

Страница 7: ...ces crawl or attic that freely exchange with the outdoors See Figure 3 Figure 3 Combustion Air Drawn from a Crawl Space or Vented Attic TOTAL INPUT RATING BTUH MINIMUM FREE AREA EACH OPENING ROUND DUC...

Страница 8: ...which draw combustion air from that space In general a furnace installed in an unconfined space will not requireoutsideairforcombustion However inhomesbuiltfor energy efficiency low air change rates...

Страница 9: ...ft for each additional 2 inch short radius elbow 3 5 ft for each additional 3 inch long radius elbow and 7 ft for each additional 3 inch short radius elbow Subtract 5 ft for each 2 tee and 8 ft for e...

Страница 10: ...g horizontally a side wall vent kit is available according to the pipe diameter size of the installation For 2 inch pipe use side wall vent kit 904617 and for 3 inch pipe use kit 904347 Please follow...

Страница 11: ...ustion air piping may be installed in an existing chimney which is not in use provided that Both the exhaust vent and air intake run the length of the chimney The top of the chimney is sealed and weat...

Страница 12: ...and condensing on the heat exchanger If a manually operated damper is installed it must be designed so that operation of the furnace is prevented when the damper is in the cooling position and operat...

Страница 13: ...any combustible material other than wood flooring SD series gas furnaces are shipped with the bottom panel installed as shown in Figure 23 page 31 If the furnace is installed with only side return air...

Страница 14: ...he left or right side of the furnace use the extra screw provided in the parts package 6 Remove the cabinet plug from side of furnace and reinstall in hole on opposite side of cabinet 7 Install in lin...

Страница 15: ...m the top to the bottom section of the cabinet or open grommet holes in the cabinet PVC Components IMPORTANT NOTES Before permanently installing these components it is recommended you dry fit them fir...

Страница 16: ...retighten the clamp It is permissible to locate the trap away from the furnace The condensate drain system J trap and drain tube should be no more than 30 equivalent feet while maintaining 1 4 per foo...

Страница 17: ...building immediately Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department All gas piping mus...

Страница 18: ...y omitted for clarity of pipe installation Gas Valve See Note B See Note A Plug Flexible Gas Line Flexible Gas Line FURNACE INPUT MAIN BURNER ORIFICE SIZE MAIN AIR ORIFICE DIAMETER MANIFOLD PRESSURE 5...

Страница 19: ...page 36 Figure 25 page 37 or the unit wiring label IMPORTANT NOTES An electrical disconnect must be installed readily accessible from and located within sight of the furnace See Figure 24 page 36 or...

Страница 20: ...k White Black White START UP ADJUSTMENTS Pre Start Check List Verify the polarity of the connections are correct the line voltage power leads are securely connected and the furnace is properly grounde...

Страница 21: ...possible The thermometer on the supply air side must be shielded from direct radiation from the heat exchanger to avoid false readings 2 Adjustallregistersandductdamperstothedesiredposition and run t...

Страница 22: ...ower motor is running tP is displayed following with the Tap number For instance If the blower motor has been set for Tap 4 tP4 will be displayed Ifanalarmisdetected theerrorcodedisdisplayedstarting w...

Страница 23: ...3 digit display will show 1dL which means idle Press the MENU button the control will show the options on the display Keep pressing the MENU button the options are Err L6F Cr Cod OdU HOd COF COP HtP...

Страница 24: ...36 and Figure 25 page 37 Heating Cycle 1 ThethermostatcallsforheatbyenergizingtheWterminal with 24VAC 2 The control checks the HLI input for a closed limit 3 The control performs a circuitry check an...

Страница 25: ...eady for the next call Cooling Cycle When Y1 and G or Y1 Y2 and G signals are detected the control will operate in compressor cooling mode The Electronic Air Cleaner EAC relay will energize 5 seconds...

Страница 26: ...be inspected and cleaned if required by a qualified service technician annually to ensure continued safe operation Pay attentiontoanydeteriorationfromcorrosionorothersources WARNING Holes in the vent...

Страница 27: ...ce the recycle count will start over Internal Control Fault E2 3 Internal relay in the control board has failed Replace the board Control senses 24V output to the gas valve If voltage is not sensed to...

Страница 28: ...2 Measure the pressure If the pressure is as expected replacethepressuretransducer There should not be measurable amount of pressure when furnace is idle Atacallforheatthecontrolmonitorsthepressure se...

Страница 29: ...s stuck on the board Replace the board The control senses 24V output from internal relays at all times If power is detected at the HLO output on the 12 pin plug at any time even without a call for hea...

Страница 30: ...nsate Drain Switch The Condensate Drain Switch will shut down the furnace if the condensate drain from the Collector Pan becomes clogged BlowerLimitSwitch Preventsoperationoftheblowermotor when the bl...

Страница 31: ...TTOM VIEW TOP VIEW 4 Knockouts both sides 1 LEFT SIDE RIGHT SIDE 3 1 4 Gas 1 5 8 T stat 7 8 Electric 7 8 Vent pipe 3 Cond 1 1 16 T stat 7 8 Electric 7 8 Gas 1 5 8 Condensate 1 1 16 Vent pipe 3 Combust...

Страница 32: ...0 5 CFM RISE CFM RISE CFM RISE CFM RISE CFM RISE 050U T23A 50 000 BTU Hr Input 50 000 Btuh Input Btuh Output Bottom Tap 9 Tap 8 Tap 7 Tap 6 Tap 5 970 45 935 47 915 48 880 50 845 52 Tap 4 875 50 835 53...

Страница 33: ...50 1 315 1 285 1 255 1 225 1 200 Tap 8 1 290 1 260 1 230 1 195 1 160 1 135 1 100 1 070 Tap 7 1 145 1 115 1 090 1 055 1 030 995 960 920 Tap 6 1 045 1 015 980 950 920 885 855 825 Tap 5 935 915 880 845 8...

Страница 34: ...0 Btuh Input 95 000 Btuh Output Bottom Only 9 8 7 6 1 850 48 1 790 49 1 745 50 1 700 52 1 650 53 5 1 745 50 1 690 52 1 645 53 1 590 55 1 535 57 4 1 480 59 1 420 62 1 360 65 3 2 1 Side Only 9 8 7 6 1 7...

Страница 35: ...95 1 015 945 870 790 715 665 615 1 980 905 835 740 665 590 525 440 Bottom Side 9 2 245 2 195 2 155 2 095 2 065 2 070 2 015 1 950 8 2 080 2 030 1 980 1 930 1 880 1 820 1 765 1 705 7 1 915 1 875 1 820 1...

Страница 36: ...GROUND TO CHASSIS TO CHASSIS Refer to the Installation Instructions provided with the furnace for the proper heating and cooling speeds for your application Refer to the Installation Instructions for...

Страница 37: ...R TWIN W2 W1 B C Y2 GND Y1 O R G PRESSURE TRANSDUCER GND P1 5V INDUCER PRESSURE SWITCH 1 INDUCER PRESSURE SWITCH 2 COLLECTOR SWITCH PS2 PS1 PS0 MVC HLI ILI HLO MVL GND 5A FUSE K4 TR TH K2 GAS VALVE FL...

Страница 38: ...88 375 98 37 184 367 100 36 180 360 102 35 176 353 104 35 173 346 106 34 170 340 108 33 167 333 110 33 164 327 112 32 161 321 114 32 158 316 116 31 155 310 118 31 153 305 120 30 150 300 CAPACITY OF BL...

Страница 39: ...tended above meter regulator assembly I Clearance to service regulator vent outlet J Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 6 inche...

Страница 40: ...st slope upward 1 4 per foot 5 7 90 Elbows 90 Elbow COMBUSTION AIR Straps or other suitable supports at minimum 5 ft intervals both pipes 90 Elbows Flue Pipe must slope upward 1 4 per foot First suppo...

Страница 41: ...E 2 Inline Drain Field Supplied See NOTES 2 3 Collector Box Drain Factory Equipped See NOTE 2 X See NOTE 5 X See NOTE 5 FLUE PIPE X See NOTE 5 X See NOTE 5 FLUE PIPE Inline Drain Tube Factory Supplied...

Страница 42: ...IGHT 1 PIPE OPTIONS Plug VIEW D VIEW E VIEW F VIEW G COMBUSTION AIR FLUE PIPE OPTION 7 OPTION 8 COMBUSTION AIR Rubber Grommet See VIEW D for drain line positions See VIEW E for drain line positions Pl...

Страница 43: ...d See NOTES 2 3 Collector Box Drain Factory Equipped See NOTE 2 Inline Drain Field Supplied See NOTES 2 3 Field Supplied Drain Line Attached to PVC Trap Do Not Trap COMBUSTION AIR FLUE PIPE Flange COM...

Страница 44: ...ft Installation Inducer Vertical Horizontal Left Installation Inducer Rotated Left Horizontal Right Installation Inducer Vertical Horizontal Right Installation Inducer Rotated Right Alternate Location...

Страница 45: ...lation Inducer Vertical Horizontal Left Installation Inducer Rotated Left Horizontal Right Installation Inducer Vertical Horizontal Right Installation Inducer Rotated Right Alternate Locations Alterna...

Страница 46: ...46...

Страница 47: ...47...

Страница 48: ...instructing the customer on how to operate and maintain the equipment for the life of the product Safety should always be the deciding factor when installing this product and using common sense plays...

Отзывы: