43
Figure 29. Venting Options for 2-Pipe Horizontal Installations
*SD SERIES
HORIZONTAL RIGHT - 2 PIPE OPTIONS
Plug
VIEW -H-
VIEW -I-
VIEW -J-
VIEW -K-
OPTION
11
OPTION
12
Rubber
Grommet
See VIEW H for
drain line positions
See VIEW I for
drain line positions
Plug
FLUE PIPE
OPTION
14
OPTION
13
See VIEW J for
drain line positions
Plug
FLUE PIPE
Plug
See VIEW K for
drain line positions
Plug
Plug
Plug
Plug
Rubber
Grommet
*SD SERIES
HORIZONTAL LEFT - 2 PIPE OPTIONS
Collector Box Drain
(Factory Equipped)
See NOTE 2
Inline Drain
(Factory Supplied)
See NOTE 4
Inline Drain
(Field Supplied)
See NOTES 2 & 3
Inline Drain
(Field Supplied)
See NOTES 2 & 3
Collector Box Drain
(Factory Equipped)
See NOTE 2
Inline Drain
(Field Supplied)
See NOTES 2 & 3
Field Supplied
Drain Line Attached
to PVC Trap
(Do Not Trap)
COMBUSTION AIR
FLUE PIPE
Flange
COMBUSTION AIR
X
See
NOTE 5
FLUE PIPE
Rubber
Grommet
COMBUSTION AIR
X
See
NOTE 5
COMBUSTION AIR
NOTES:
) for optional PVC Tee configurations and drainage options.
2. Drain lines must be trapped with a J-Trap or field supplied loop. Traps may be positioned inside or outside the cabinet. All drain lines must be routed externally
from the cabinet.
3. Inline drain is required only if “X” is greater than 6 feet.
4. Tubing needs to be cut to length and attached during unit installation.
5. Horizontal piping from inducer to flue pipe must be sloped 1/4” per foot to ensure drainage to PVC trap.