![Nortek PVE 120 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/nortek/pve-120/pve-120_installation-commissioning-servicing_1706006024.webp)
Page 22 Reznor, PVE, Installation Manual EN 2019-11, D301113 iss D
Note: If the reset button requires
activating for any reason, the cause
must be determined. After determining
and correcting the problem, restart the
heater and monitor long enough to
ensure proper operation (approximately 5
minutes).
An orange indicator light is fitted on the
heater to signify when the burner is on.
Ensure that all cables are fixed and that they
do not touch the combustion collector box.
Start up
1. Check installation prior to start up
2. Check Unit must be secure. Verify that
no other parts are fitted which are not
individually supported and secured.
3. Check clearances from combustibles.
4. Check vent system to be sure that it is
installed according to the instructions in
flue requirements.
5. Check piping for leaks and proper gas line
pressure. Bleed gas lines of trapped air.
6. Check electrical wiring and ensure that
wiring conforms with the wiring diagram.
Be sure all wire sizes meet requirements.
7. Check polarity. Verify that line voltage
exists between the black “L1” and earth
ground.
8. Verify that the appliance is earthed by
conducting an earth continuity test.
For your safety, follow the
instructions exactly otherwise
damage or injury could occur.
• This heater does not have a pilot flame. It
is equipped with an ignition device which
automatically lights the burner. Do not try
to light the burner by hand.
• Ensure that all pressure test points (on the
gas valve and manifold) along with the
pilot outlet plug (see Figures 9 and 10, item
6) are fully closed and gas tight.
• Before operating, smell all around the
heater area for gas. Be sure to smell next
to the floor because propane gas is heavier
than air and will settle near the floor.
• Do not use this appliance if any part
has been subjected to water ingress.
Immediately call a qualified service
technician to inspect the appliance and to
replace any part of the control system and
any gas control.
• When overheating occurs or when gas
supply is not turned off, shut the manual
gas tap before turning off the electric
power.
Operating
Operating sequence
1.Set SmartCom3 to the lowest temperature
setting.
2.Turn off all electric power to the heater.
3.Shut the gas cock at the inlet of the unit.
4.Wait five minutes to clear out any gas.
Then smell for gas, including near the floor.
If you smell gas, stop immediately and follow
the steps in the warnings in GAS LEAK
EMERGENCY section . If you do not smell gas,
proceed to the next step.
5.Turn on the electric power to the heater.
6.Open the gas cock at the inlet of the unit.
7.Ensure that the SmartCom3 is set to an ‘ON’
period.
8.Adjust the SmartCom3 temperature to the
required setting (must be above current room
temperature).
If the appliance does not operate, follow
the instructions “To turn off gas supply at
the appliance” printed and call your service
technician.(In the next section)
9.SmartCom3 calls for heat, energising the
venter motor.