![Nortec RH2 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/nortec/rh2/rh2_installation-and-operation-manual_1705822005.webp)
Introduction |
2
Receiving and Unpacking
1
Check packing slip to ensure ALL material has been delivered.
2
All material shortages are to be reported to Nortec within 48 hours from receipt of goods.
Nortec assumes no responsibility for any material shortages beyond this period.
3
Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
4
After unpacking, inspect equipment for damage and if damage is found, notify the shipper
promptly.
5
All Nortec products are shipped on a Free-On-Board (FOB) factory basis. Any and all damage,
breakage or loss claims are to be made directly to the shipping company.
Before Installation
1
Ensure that available voltage and phase corresponds with humidifier voltage and phase as
indicated on humidifier’s specification label.
2
Ensure that the dedicated external fuse disconnect is of sufficient size to handle the rated
amps as indicated on the specification label. Refer to local codes.
3
Report any discrepancy immediately to the site engineer, if applicable.
4
Ensure sufficient clearances will be available as described in the Location section on pg 7.
5
Ensure steam lines can be routed to duct distributor or blower pack as described in Steam
Lines and Condensate Return Instructions on page 12.
Figure 1: Specification Label Location
MADE IN CANADA
MODEL:
VOLTS 1:
F.L.A:
KW:
XXXXXXXXXXXXXXXXXXXXXXXX
S/N:
XXXXXXX
XXXXXXXXX
PHASE:
XXXX
HZ:
XXXXX
XXXXXX
DATE:
XXXXXXXXX
VOLTS 3:
XXXXXXXXX
VOLTS 2:
XXXXXXXXX
F.L.A:
XXXXX
F.L.A:
XXXXX
XXXXXX
XXXXXX
KW:
KW:
Содержание RH2
Страница 9: ...Installation 6 Typical RH2 Installation Figure 3 Typical Humidifier Installation 2 ...
Страница 22: ...19 Installation On Off Control Wiring Figure 18 On Off Controls Figure 19 Digital On Off Humidistat ...
Страница 23: ...Installation 20 Modulating Control Wiring Figure 20 Modulating Controls Figure 21 Modulating Control Wiring ...
Страница 33: ...Start Up 30 ...
Страница 38: ...35 Operation Humidifier Schematic Figure 29 Humidifier Schematic ...
Страница 56: ...53 Troubleshooting RH2 Wiring Diagram ...
Страница 60: ...57 Spare Parts ...