![Nortec RH2 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/nortec/rh2/rh2_installation-and-operation-manual_1705822031.webp)
Start Up |
28
RH2 Pre-Start Up Checklist
Unit Serial #: _________________ No. of humidifiers: _______ Tag: _______________
Unit type: _______ __________
Voltage: ________V/_____ph
Cylinder type:
Customer/Job:
Address:
WATER QUALITY:
Well water
City water
Softened water
HUMIDIFIER MOUNTING:
Level
• Front Clearance 36 in.
STEAM LINE(S):
Material
• Diameter / Size
Slope up (min 2 in/ft)
• Slope down (min 0.500 in/ft)
Low point condensate traps
• No hose kinks / Restrictions
Minimum 1 inch insulation
CONDENSATE LINE(S):
P Trap min 6 in or duct press + 2in
• P Trap min 12 in drop
WATER LINE:
1/2 in to within 4ft of unit
• Water pressure: 30-80 psig
Cold water source (34-68ºF/1-20ºC)
DRAIN LINE:
Air gap within 3 ft of the unit
• Diameter / Size
CYLINDER:
Seated in drain valve
yes
no
Torque for gear clamp of cylinder steam exit to steam line (max 12 in•lbs): ______________
WIRING:
Wiring connections and connectors secured
yes
no
CONTROLS:
On / Off / Security loop devices working correctly
yes
no
Jumper J10 set to
Modulating (removed)
Or
On/Off (installed)
Control Location
High Limit Location
POWER:
Voltage, amp, fuse per Spec Label:
yes
no
Disconnect switch located close to humidifier
yes
no
Panel Number
Inspected by:
Date of inspection: ______/_______/______
Company:
Содержание RH2
Страница 9: ...Installation 6 Typical RH2 Installation Figure 3 Typical Humidifier Installation 2 ...
Страница 22: ...19 Installation On Off Control Wiring Figure 18 On Off Controls Figure 19 Digital On Off Humidistat ...
Страница 23: ...Installation 20 Modulating Control Wiring Figure 20 Modulating Controls Figure 21 Modulating Control Wiring ...
Страница 33: ...Start Up 30 ...
Страница 38: ...35 Operation Humidifier Schematic Figure 29 Humidifier Schematic ...
Страница 56: ...53 Troubleshooting RH2 Wiring Diagram ...
Страница 60: ...57 Spare Parts ...