1. Lay the base plate into place (similar to
the top plate but without the glued-on felt
mat). The plate must be lined up so that it
is level, and with the correct distance to the
masonry and any flammable materials. See
page 2 & 3.
2. Connect together the 2-part .6” steel ring
(these will be the thinnest 2-part rings)
and center them on the base plate.
3. Place the side stones unto the steel ring,
making sure the stone drops into place.
Be careful not to chip the stones while
placing them onto the steel ring assembly.
Do the same with the front stone and the
rear stone. Note: the hole in the rear stone
should be closest to the bottom.
4. Assemble the 2-part 1.2” steel ring. Place
the ring assembly into the groove on the
top of the stones that you just placed. Insert
the (4) thin metal strips down into the
vertical slots between the stones.
Step 2
Fig. 2
Assembling section 2
(4 or 5 section stove)
1. Set in place (2) side stones, with the recess for
the side window facing upwards.
2. Place the front and rear stones, with the widest
groove facing down.
3. Place the 1.2 “steel ring assemby with the recess
facing upwards and to the front.
4. Insert the (4) thin metal strips down into the
vertical slots between the stones.
Assembling section 1,
(all stoves)
Step 1
Fig. 1
*If you are assembling a (3) section
stove, skip Step 2, go to step 3
Fig. 1
Fig. 2
2-part steel
ring assembly
Section 1
Section 2
Recess for side window
Содержание Kube 3
Страница 17: ...Exploded view ...
Страница 28: ...Exploded Parts View ...