background image

29

outdoor thermostat closes, the high fire on gas
valve opens and the furnace operates in the
high fire mode at higher blower speed.

5.

Timed staging configuration – For this installa-
tion, the low and high on the gas valve are
connected in parallel with a delay on make timer
(two wire style) in series with the low fire gas
valve (See Figure 32). 

CAUTION: 

DO NOT

CONNECT W2 from thermostat to the furnace
wiring when using timed stage configuration.
When the low fire on the gas valve is energized,
the furnace operates in the low fire mode at a
lower blower speed and the timer begins its
delay function. If the room thermostat is not
satisfied before the timer activates, the furnace
will stage to high fire and the blower will operate
at a higher speed until the room thermostat is
satisfied.

Install the thermostat per the manufacturer's
instructions. The low voltage (24 volt) connec-
tions from the thermostat are made at the
terminal strip on the control board in the fur-
nace. See Figures 28-32 for the proper con-
nections for heating only (four wire) and heat-
ing/cooling (five wire) applications. The rec-
ommended minimum wire gauge for thermo-
stat wiring is shown in Table 10.

The thermostat must not be installed on an
outside wall or any other location where its
operation may be adversely affected. Adverse
affects include radiant loading from fireplaces,
sunlight, or lighting fixtures, and convective load-
ing from warm air registers or electrical appli-
ances.

To check the heat anticipator setting either:

1. Add the current draw of the system compo-

nents; or

2. Measure the current flow on the thermostat R-

W circuit after the circulating blower motor has
started.

Set the heat anticipator according to the ther-
mostat manufacturer's instructions for heat
anticipator settings.

START-UP AND ADJUSTMENTS
General

Prior to start-up, verify that:

1. The line voltage power leads are securely

connected, that the polarity of the connections
is correct, and that the furnace is properly
grounded.

2. The thermostat wires (R, W, Y, and G) are

securely connected to the correct leads on the
terminal strip of the circuit board.

3. The gas line service pressure does not exceed

10.0 in. water column  (0.36 psig), and is not less
than 4.5 in. water column (0.16 psig) for natural
gas.  For LP gas the line service pressure must
not exceed 14 in. water column  (0.51 psig), and
must not be less than 11.0 in. w.c. (0.40 psig).

4. The roll-out and vent safety manual reset

switches are closed.  If necessary, press the
red button to reset a switch.  DO NOT install a
jumper wire across a switch to defeat its
function.  If a switch reopens on start-up, DO
NOT reset the switch without identifying and
correcting the fault condition which caused the
switch to trip.

5. The blower door is in place, closing the door

switch in the line voltage circuit.

6. The gas line has been purged and all connec-

tions are leak tight.

Start-up Procedures

After all of the above checks have been made:

1. Set the thermostat to the lowest setting.
2. Close the disconnect(s) to provide line voltage

to the furnace.

3. Follow the procedures given on the operating

instruction label attached to the furnace.

4. Set the thermostat above room temperature

and verify the operating sequence. (See the
Sequence of Operation).

5. After the furnace has run for approximately five

minutes, set the thermostat below room tem-
perature and verify steps (9) through (11) of the
Sequence of Operation.

Verifying and Adjusting Firing Rate

The firing rate must be verified for each installation
to prevent over-firing  the furnace.

IMPORTANT NOTE:
The firing rate must not exceed the rate
shown on the furnace rating plate. At alti-
tudes above 2000 feet it must not exceed
that on the rating plate less 4% for each
1000 feet.

Follow the procedure below to determine the
firing rate.

1. Shut off all other gas fired appliances.
2. Start the furnace and allow it to run for at least

three minutes.

3. Measure the time (in seconds) required for the

gas meter to complete one revolution.

Содержание TA-060C-08A

Страница 1: ...nguish any open flame TA 80 Upflow Horizontal TK 80 Downflow These instructions are primarily intended to assist qualified individuals experienced in the proper installation of this appliance Some loc...

Страница 2: ...2...

Страница 3: ...0 Location of Outdoor Terminations 20 Horizontal Installation 20 Flexible Vent Systems 21 Circulating Air Supply 21 General 21 Return Air 21 Gas Supply and Piping 23 General 23 Leak Check 23 High Alti...

Страница 4: ...Air Opening Side 1 1 4 1 1 4 D 23 Return Air Opening Bottom 7 8 Note Can be C or N High Low Dimensions Shipping Model Input Input A B C Flue Outlet Weight D TA Btuh Btuh in in in in lbs IN 060 08A 60...

Страница 5: ...ing Weights Note Can be C or N Model High Low Shipping Number Input Input A B C Weights TK Btuh Btuh inches inches inches lbs 060 08 60 000 42 000 14 1 4 12 3 4 5 1 2 134 060 12 60 000 42 000 14 1 4 1...

Страница 6: ...8 32 1055 51 34 980 54 36 910 58 40 795 67 44 640 83 55 525 68 1870 28 18 1845 29 19 1790 30 20 1735 31 20 1665 32 21 1580 33 22 1500 35 23 1400 38 25 1480 36 24 1450 37 24 1420 38 25 1380 39 26 1325...

Страница 7: ...18 1945 27 18 1900 28 18 1850 29 19 1780 30 20 1715 31 21 1640 33 22 1545 35 23 1680 32 21 1650 32 21 1625 33 22 1600 33 22 1560 34 23 1505 35 23 1420 37 25 1330 40 27 1450 36 24 1410 37 25 1390 38 2...

Страница 8: ...nal Standards Institute Inc 1430 Broadway New York New York 10018 Additional helpful publications are NFPA 90A Installation of Air Conditioning and Ventilating Systems NFPA 90B Warm Air Heating and Ai...

Страница 9: ...water The furnace must be installed upstream from a refrigeration system This furnace is not to be used for temporary heating of buildings or structures under construction Clearances to Combustibles...

Страница 10: ...um clearance for servicing The recommendedclearanceis36 Upflow Furnace Models Vent Connector Type Standard Single Wall Metal Vent Type B 1 Double Wall Metal Vent LEFT SIDE 0 0 RIGHT SIDE 0 0 VENT 6 1...

Страница 11: ...TK 060 Figure 2 Opening for Concrete Slab Figure 5 Downflow Sub Base Dimensions Supply Air Plenum Installation A Installation on a concrete slab TK 1 Construct a hole in the floor per the dimension in...

Страница 12: ...e use of indoor air in most applications is acceptable except as follows 1 If the furnace is installed in a confined space it is recommended that the necessary combus tion air come from the outdoors b...

Страница 13: ...ontally in an attic basement crawl space or alcove It can be suspended from a ceiling in a basement or utility room in either a right to left airflow or left to right airflow See Figures 7 and 8 If th...

Страница 14: ...ion Air Drawn from the Outside through Exterior Wall Each opening to outside must be at least 1 sq in per 4000 Btuh of total input rating 12 Max 12 Max Total Input Rating Btuh 40 000 60 000 80 000 100...

Страница 15: ...r Duct must be at least 1 sq in per 4 000 Btuh of total input rating Furnace Water Heater Vent or Chimney In Canada venting shall conform to the require ments of the current CAN CGA B149 1 or 2 instal...

Страница 16: ...23 1 NFPA 54 or the CSA B149 1 Natural Gas and Propane Installation Codes and these instructions Deter mine that there is no blockage or restriction leakage corrosion and other deficiencies which coul...

Страница 17: ...L International vent brand name Star 34 Vent This vent pipe must be used for the entire length of the vent run The installation must be in accordance with all instructions supplied by the vent manufac...

Страница 18: ...erminals strip wiresandtietogetherinawirenut SeeFigure 16 2 Remove the rubber tubing from the pressure switch sensor tube and the collector pan sen sor tube Cut the tubing approximately 3 from one end...

Страница 19: ...on of condensate at any location other than at the tee 6 Horizontal runs must be supported with 3 4 pipe strap at a maximum of 5 foot intervals and at each point where an elbow is used 7 Maintain a 6...

Страница 20: ...learance to permanently closed window D Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 2 feet 61 cm from the center line of the terminal E Clearance...

Страница 21: ...eceofventpipe and connect the coupling to the termination tee The inside of the tee must be a minimum of 12 inches from the outside of the wall See Figure 23 Flexible Vent Systems Flexible gas vent is...

Страница 22: ...tion of the cooling system is prevented when the damper is in the heating position Return Air In applications where the supply ducts carry heated air to areas outside the space in which the furnace is...

Страница 23: ...g placement of the manual main gas shut off In the absence of local codes the gas line instal lation must comply with the latest edition of the National Fuel Gas Code ANSI Z223 1 or CAN CGA B149 1 or...

Страница 24: ...s or other sources of open flame to check for gas leaks IMPORTANT NOTE When pressure testing the gas supply lines at pressures greater than 1 2 psig 14 inch W C the furnace must be disconnected from t...

Страница 25: ...0 and 10 000 ft Above Sea Level Furnace Rating Furnace Rating Plate Input Btu h Nat LP Plate Input Btu h Nat LP 60 000 45 55 60 000 45 56 72 000 43 54 72 000 43 55 96 000 43 54 96 000 43 55 120 000 43...

Страница 26: ...To avoid electric shock personal injury or death turn off the electric power at the disconnect or the main service panel before making any electrical connections ELECTRICALWIRING General Electrical co...

Страница 27: ...Verify that the incoming neutral line is connected to the white wire and the incoming hot line is connected to the black wire These furnaces will not operate unless the polarity and ground are proper...

Страница 28: ...MH ML L 1 2 3 4 5 6 1 2 3 4 5 6 3 OR 4 SPEED MOTOR RED ORANGE BLUE BLACK WHITE THESE WIRES ARE NOT PRESENT ON ALL MODELS BLACK INTEGRATED CONTROL BOARD 1 YELLOW BROWN YELLOW RED LOW FIRE BLUE HIGH FIR...

Страница 29: ...ted that the polarity of the connections is correct and that the furnace is properly grounded 2 The thermostat wires R W Y and G are securely connected to the correct leads on the terminal strip of th...

Страница 30: ...M M1 M2 M3 HEAT COOL EAC XFMR L1 9 6 3 8 5 2 7 4 Legend Field Wiring Factory Wiring Low Voltage High Voltage R C Y G W ORANGE HI LO C BROWN BROWN Y C AIR CONDITIONER CONDENSING UNIT 2 4 5 6 N O N C 24...

Страница 31: ...M2 M3 HEAT COOL EAC XFMR L1 9 6 3 8 5 2 7 4 Legend Field Wiring Factory Wiring Low Voltage High Voltage R C Y G W ORANGE HI LO C BROWN ODT BROWN Y C AIR CONDITIONER CONDENSING UNIT 2 4 5 6 N O N C 24...

Страница 32: ...ecified range could result in premature heat exchanger failure Place thermometers in the return and supply air stream as close to the furnace as possible The thermometer on the supply air side must be...

Страница 33: ...ing satisfactory flame characteristics set the thermostat to a temperature below room tem perature and verify that the burner flame extin guishes completely Verify Operation of the Supply Air Limit Sw...

Страница 34: ...ON OF COMPONENTS Figure 36 shows the location of each of the functional components described below Also refer to the Sequence of Operation Section of this manual If any component of the furnace Legend...

Страница 35: ...Flame Sensor The flame sensor acts to prove that flame has carried over from the igniter to the opposite end burner If no flame is sensed the furnace will shut down within 7 seconds of ignition Flame...

Страница 36: ...nd possible fire Air filter s are not supplied with the furnace as shipped from the factory The installer must provide a high velocity filter and rack for a filter in the return air duct adjacent toth...

Страница 37: ...emove the louvered door from the furnace 4 Turn the gas control lever to the OFF position 5 Disconnect the wires from the gas valve igniter flame sensor combustion air motor flameroll outswitch blocke...

Страница 38: ...er flammable vapors and liquids in the vicinity of the furnace 3 Change or replace the air filters monthly during any period when the circulating blower is oper ating regularly 4 Always replace the do...

Страница 39: ...r contin ues to operate for the specified delay factory set at 120 seconds Cooling Mode 1 On a call for cooling the thermostat closes applying24VACtotheGandYterminalsonthe furnace control This closes...

Страница 40: ...rnace Input _________________ Btuh Supply Air Temperature _________ F Return Air Temperature _________ F Temperature Rise ______________ F Are Flue Connections tight _____________ Is there Proper Draf...

Отзывы: