Power-Up and Testing
4-1
4 Power-Up
and
Testing
4.1 Overview
Once you have performed installation of the accessories, you are ready to power up and functionally test
the dispensing system. This section covers the following topics:
•
•
•
Connecting the Power and Air Supply
•
Powering on the Dispensing System
•
Starting Fluidmove for Windows (FmXP)
•
•
Exiting Fluidmove for Windows (FmXP)
•
•
Component-Level Functional Tests
•
4.2 Safety
First
Operation of your S-920 Dispensing System involves heat, air pressure, electrical power, mechanical
devices, and the use of hazardous materials. It is essential that every person servicing or operating the
dispensing system fully understands all hazards, risks, and safety precautions. Refer to
for additional information.
4.3 Facility
Requirements
To ensure optimal performance and safety, it is necessary to install the dispensing system in a facility that
meets the requirements. If you have any questions about facility requirements, please contact Asymtek
Technical Support. See
Содержание Asymtek Spectrum S-920
Страница 1: ...Spectrum Series S 920 Dispensing System Installation Operations Maintenance Manual P N 7212417 Rev A...
Страница 2: ......
Страница 4: ......
Страница 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Страница 124: ......
Страница 172: ...7 12 Maintenance Figure 7 7 Lubricating the X Axis Linear Guides Figure 7 8 Lubricating Y Axis Linear Guides...
Страница 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Страница 190: ......
Страница 204: ......
Страница 208: ......
Страница 210: ......
Страница 220: ......
Страница 222: ......
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 234: ......