Step3: Drill Wall Hole
23
70
m
m
Wall sleeve
(Optional)
5-10mm
Wall sleeve Cover
(Optional)
Outdoor
Indoor
Small bolique angle
INDOOR UNIT INSTALLATION
Step2: Install Mounting Plate
Spirit level
Mounting plate
Reference screw positions
2.1 Take the mounting plate from the back of indoor unit.
2.2 Ensure to meet the minimum installation dimension requirements as step 1, according to the size
of mounting plate, determine the position and stick the mounting plate close to the wall.
2.3 Adjust the mounting plate to a horizontal state with a spirit level, then mark out the screw hole
positions on the wall.
2.4 Put down the mounting plate and drill holes in the marked positions with drill.
2.5 Insert expansion rubber plugs into the holes, then hang the mounting plate and fix it with screws.
A hole in the wall should be drilled for refrigerant piping ,the drainage pipe, and connecting cables.
3.1 Determine the location of wall hole base on the position of mounting plate.
3.2 The hole should be have a 70mm diameter at least and a small oblique angle to facilitate drainage.
3.3 Drill the wall hole with 70mm core drill and with small oblique angle lower than the indoor end
about 5mm to 10mm.
3.4 Place the wall sleeve and wall sleeve cover(both are optional parts) to protect the connection parts.
Caution:
When drill the wall hole, maker sure to avoid wires, plumbing and other sensitive components.
Note:
(I) Make sure the mounting plate is firm enough and flat against the wall after installation.
(II)
This figure shown may be different from the actual object, please take the latter as the standard.
Содержание 18K-36K
Страница 1: ......