19
8.2
Valve Module
1.
Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin
Deutsch (CANbus) connectors towards the “P” and “T” ports with the label facing up.
Figure 19: Valve Module
2.
Verify the valve coil connectors are oriented vertically (
Figure 20
).
Figure 20: Align Coils
3.
Place the valve module between the valve coils. Slide a valve mounting bracket over the
connectors of the valve module and the valve coil connectors. This may require flexing the
plastic bracket slightly (
Figure 21
).
4.
Ensure the bracket is pushed over the connectors far enough to allow the clips to engage
behind the valve connectors.
Output Number Normal Function
1
Left Up
2
Left Down
3
Right Up
4
Right Down
5
Main Up
6
Main Down
7
Option 3
8
Option 4
Содержание UCB Sx275
Страница 1: ...Versatile Sx275 Installation Manual VS01 ...
Страница 7: ...4 4 Kit Parts 4 1 Kit Overview Figure 2 VS01 System Parts ...
Страница 8: ...5 4 2 Hydraulic Plumbing Figure 3 VS01 Hydraulic Plumbing ...
Страница 31: ...28 12 3 ITEM C03 43220 03 CABLE UC5 NETWORK 14 AWG 3M 12 4 ITEM C05 43210 20 CABLE UC5 NETWORK 18 AWG 20M ...
Страница 32: ...29 12 5 ITEM C10 43230 04 CABLE UC5 VALVE DT TO DT ...
Страница 33: ...30 12 6 ITEM C20 43240 01 CABLE UC5 INTERFACE TILT DT ...
Страница 34: ...31 12 7 ITEM C21 43240 07 CABLE UC5 INTERFACE MAIN DT WITH AUX 1 2 ...
Страница 35: ...32 12 8 ITEM C30 43250 04 CABLE UC5 BATTERY AMP FUSED 5A ...