![Norac UC5 Sx275 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/norac/uc5-sx275/uc5-sx275_manual_1700480018.webp)
15
7
Roll Sensor Installation
7.1
Bracket Assembly
1.
Securely mount the roll sensors to the included roll sensor brackets using the #6 machine
screw and nylon lock-nuts.
2.
The orientation of the mounted roll sensor to the roll sensor bracket will depend on the
bracket mounting. The roll sensor CANbus connector must be pointing towards the right
side of the sprayer.
Figure 13: Mounting Roll Sensor to Bracket
Figure 14: Roll Sensor Orientation - Connector Facing Right Wing
Содержание UC5 Sx275
Страница 1: ...Versatile Sx275 Installation Manual VS01 ...
Страница 7: ...4 4 Kit Parts 4 1 Kit Overview Figure 2 VS01 System Parts ...
Страница 8: ...5 4 2 Hydraulic Plumbing Figure 3 VS01 Hydraulic Plumbing ...
Страница 31: ...28 12 3 ITEM C03 43210 03 CABLE UC5 NETWORK 18 AWG 3M 12 4 ITEM C04 43210 01 CABLE UC5 NETWORK 18 AWG 1M ...
Страница 32: ...29 12 5 ITEM C05 43210 20 CABLE UC5 NETWORK 18 AWG 20M 12 6 ITEM C10 43230 04 CABLE UC5 VALVE DT TO DT ...
Страница 33: ...30 12 7 ITEM C20 43240 01 CABLE UC5 INTERFACE TILT DT ...
Страница 34: ...31 12 8 ITEM C21 43240 07 CABLE UC5 INTERFACE MAIN DT WITH AUX 1 2 ...
Страница 35: ...32 12 9 ITEM C30 43250 04 CABLE UC5 BATTERY AMP FUSED 5A ...