19
7.2
Valve Module
1.
Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin
Deutsch (CANbus) connectors towards the “P” and “T” ports with the label facing up.
Figure 14: Valve Module
2.
Verify the valve coil connectors are oriented vertically (
Figure 15
).
Figure 15: Align Coils
3.
Place the valve module between the valve coils. Slide a valve mounting bracket over the
connectors of the valve module and the valve coil connectors. This may require flexing the
plastic bracket slightly (
Figure 16
).
4.
Ensure the bracket is pushed over the connectors far enough to allow the clips to engage
behind the valve connectors.
Output Number Normal Function
1
Left Up
2
Left Down
3
Right Up
4
Right Down
5
Option 1
6
Option 2
7
Roll CW
8
Roll CCW
Содержание UC5 Can Bus
Страница 1: ...Rogator Active Roll 2012 Installation Manual RG12 ...
Страница 7: ...4 4 Kit Parts 4 1 Kit Overview Figure 2 RG12 System Parts ...
Страница 8: ...5 4 2 Hydraulic Plumbing Figure 3 RG12 Hydraulic Plumbing ...
Страница 21: ...18 Figure 13 Control Module and Electrical Box Location ...
Страница 35: ...32 11 3 ITEM C05 43210 15 CABLE UC5 NETWORK 18 AWG 15M 11 4 ITEM C10 43230 04 CABLE UC5 VALVE DT TO DT ...