11
Table 6 – Boom Test Record (WITHOUT UC4+ Spray Height Control)
Working RPM:
Boom
Trial #1
[Sec]
Trial #2
[Sec]
Trial #3
[Sec]
Avg Time
[Sec]
Left
UP
Left
DOWN
Right
UP
Right
Down
Main
UP
Main
DOWN
Roll
CW
Roll
CCW
Table 7 – Boom Test Record (WITH UC4+ Spray Height Control)
Working RPM:
Boom
Trial #1
[Sec]
Trial #2
[Sec]
Trial #3
[Sec]
Avg Time
[Sec]
Left
UP
Left
DOWN
Right
UP
Right
Down
Main
UP
Main
DOWN
Roll
CW
Roll
CCW
Содержание UC4+
Страница 12: ...9 Figure 3 Hydraulic Plumbing Schematic ...
Страница 30: ...27 Figure 36 Load Sense Plumbing on some JD4710 Rear of Sprayer Front view of block H06 F03 ...
Страница 31: ...28 Figure 37 Load Sense Line Connection to John Deere Combination Valve Block H06 F03 Rear of Sprayer ...
Страница 32: ...29 Figure 38 2003 Load Sense Line Connection H06 F03 ...
Страница 41: ...38 5 3 ITEM C3 44656D CABLE VALVE VARIABLE RATE DT ...
Страница 42: ...39 5 4 ITEM C4 44651 VALVE EXTENSION CABLE 5 5 ITEM C10 44650 14 POWER CABLE ...
Страница 43: ...40 5 6 ITEM C12 44658 01 UC4 JD JUNCTION CABLE ...
Страница 44: ...41 5 7 ITEM C70 44658 08D UC4 ROLL BIAS VALVE CABLE DT ...
Страница 45: ...42 5 8 ITEM C71 44647 CABLE UC3 SENSOR ROLL BIAS ...
Страница 47: ...44 Figure 51 Cable C12 44658 01 BEFORE Modification ...
Страница 48: ...45 Figure 52 Cable C12 44658 01 AFTER Modification ...