36
16.
If there is a bypass/jam valve (SV6), insert the tee (
P2-R2
) on
C16
between the
bypass/jam valve connection on SV6 (
Figure 37
).
17.
Connect the 6-pin Tower on the valve cable (
Item C3
) onto
S6A
on
C11
(
Figure
35
).
18.
Install the square DIN
connectors from
C3
onto each
NORAC valve as shown in
Figure 38.
The connectors
on the valve cable are marked
RIGHT UP, LEFT UP,
RIGHT PORT
(“right
down”)
,
and
LEFT PORT
(“left down”)
.
Fasten with the
included rubber seals and
screws. Ensure that the
cables are oriented as shown,
with the cable labels
RIGHT
PORT
and
LEFT PORT
on
the SAME side as the
hydraulic hoses (the “port-
side” of the block).
Figure 38 – Valve Cable Connections
19.
Connect the sensor
branch cable (
Item
C2
) to the 4-pin
AMP plug (
P4
) on
C11
(
Figure 39
).
20.
If not done already,
route
C2
out to the
wing and main
sensors. Connect
them using the 4-
pin AMP
connectors. Follow
existing cables
and/or hydraulic
lines along the
boom.
21.
Cable-tie (
Items
M3
and/or
M2
)
every 12 inches.
Figure 39 – Cable Configurations: C11 and C2
Содержание UC4 Total Control
Страница 23: ...21 Figure 15 Installation Details ...
Страница 30: ...28 Figure 24 General Valve Block Mounting Location Figure 25 Installed NORAC Valve Block ...
Страница 41: ...39 5 3 Item C3 44656 Valve Cable Variable Rate 5 4 Item C4 44651 Valve Extension Cable ...
Страница 42: ...40 5 5 Item C10 44650 39 Power Cable Generic Self proplelled ...
Страница 43: ...41 5 6 Item C11 44651 03 Extension Cable Valve Generic ...
Страница 44: ...42 5 7 Item C12 44658 32 Interface Cable ...
Страница 45: ...43 5 8 Item C14 44658 28 Interface Cable Power Pigtail ...
Страница 46: ...44 5 9 Item C15B 44658 41 Interface Cable Hand Control RG4 5 10 Item C16 44658 33 Interface Cable Bypass ...