Nomadic Display HangTen Скачать руководство пользователя страница 2

Revised:  06/01/12                                                     

             

North America: 800.732.9395     Europe:  +353.98.66011

Connect top H1/H2 extrusion to top V1 and 
V2 extrusions (track on top). Lock with hex 
wrench.

Lift frame by support extrusion and walk it 
back into an upright position.

Connect bottom H1/H2 extrusion to 
bottom V1 and V2 extrusions (track on 
bottom). Lock with hex wrench.

Your Original frame is now ready for 
graphics.

Slide monitor extrusion into place.

Lock with hex wrench at the top and 
bottom.

Your Plus frame is now ready for 
graphics.

Your Classic frame is now ready for 
graphics.

Frame Setup Instructions

Place extrusions with locking hole facing 
up and connect.

Monitor top to Monitor bottom
Top V1 to Bottom V1 / Top V2 to Bottom V2
Bottom H1 to Bottom H2 / Top H1 to Top H2*

Top H1 to Top H2*
If you have a header, slide H channel 
above track. Lock tightly with hex wrench 
provided.

Place foot upright on floor. Insert V1 
extrusion into foot channel with locking 
holes facing inward. Lock with hex 
wrench. Repeat with V2 extrusion.

HangTen

Remove HangTen parts from black bag 
and lay them out label side up. You will 
build the frame on the ground facing 
down.

Note: When tightening with hex wrench always give it a 3/4 turn clockwise until tight.

Frames • 2

Содержание HangTen

Страница 1: ...t in Nomadic s own manufacturing plants in the U S and Ireland We use only premium grade materials and take pride in maintaining the highest standards of craftsmanship Your display is delivered to you...

Страница 2: ...lassic frame is now ready for graphics Frame Setup Instructions Place extrusions with locking hole facing up and connect Monitor top to Monitor bottom Top V1 to Bottom V1 Top V2 to Bottom V2 Bottom H1...

Страница 3: ...en display is now ready for accessories Swivel fixture to adjust position Graphic Light Setup Instructions Lift assembled frame into upright position Insert top corners of fabric graphic plastic edge...

Страница 4: ...ndoff caps Your header assembly is complete Header Setup Instructions Follow steps on the Graphic Light Instructions Lay out header parts Attach Header1 Header2 horizontal bars to either side of the H...

Страница 5: ...ff cap to a brass connector on either side of the top hole in the graphic Brass connector should be on the rear of the panel Repeat on bottom hole of graphic Your product pedestal assembly is complete...

Страница 6: ...ework until it clicks into the spring with wider side on the top Your small monitor mount and keyboard shelf assembly are complete Guide keyboard arm through slot in front of graphic panel into the ex...

Страница 7: ...wingnuts Bolt two rails to rear of monitor Lift monitor into position by sliding the vertical bars on the back of the monitor onto the monitor bracket 23 37 Medium Monitor Mount Setup Instructions La...

Страница 8: ...ertical extrusion Tighten with allen wrench provided Connect monitor bracket to the cam lock Your assembled large monitor mount should look like this without the monitor or graphic attached Lift monit...

Страница 9: ...r is locked before letting go of the graphic fin Your Origninal fin assembly is complete Original Fin Setup Instructions Follow steps on the Graphic Light Instructions Lay out pieces on the ground Ins...

Страница 10: ...Plus fin assembly is complete Classic Plus Fin Setup Instructions Follow steps on the Graphic Light Instructions Lay out fin parts Fins attach to sides of Classic Plus frame Insert edge mount standoff...

Страница 11: ...om profile onto screws Attach with two caps and twist until tight Connect top extrusion to bottom extrusion and tighten with hex wrench provided Vertical Profile Setup Instructions Follow steps on the...

Страница 12: ...screws in four places Insert internal shelf through door at an angle Your stand alone counter assembly is complete Reach through the door to secure underside of top with washers and thumb screws in f...

Отзывы: