Before You Begin
Check Point IP2450 Security Platform Installation Guide
33
3.
Optionally, remove the power supplies from the rear of the appliance.
a.
Locate the power supply on the back of the IP2450 and the two screws that secure it.
b.
Remove the two retaining screws.
c.
Remove the grounding lugs.
d.
Use the handles to gently pull the power supply out of the chassis tray assembly.
4.
Optionally, remove the chassis tray assembly from the appliance.
700W AC
FAULT
OVER
TEMP
PWR OK
00623
700W AC
FAULT
OVER
TEMP
PWR OK
Power supplies
00630
700
W A
C
FAUL
T
OVER
TEMP
PW
R OK
700
W A
C
FA
UL
T
OVER
TEMP
PWR
OK
Содержание Check Point IP2450
Страница 6: ...6 Check Point IP2450 Security Platform Installation Guide ...
Страница 8: ...8 Check Point IP2450 Security Platform Installation Guide ...
Страница 10: ...10 Check Point IP2450 Security Platform Installation Guide ...
Страница 14: ...2 About this Guide 14 Check Point IP2450 Security Platform Installation Guide ...
Страница 36: ...2 Installing the Check Point IP2450 Appliance 36 Check Point IP2450 Security Platform Installation Guide ...
Страница 46: ...3 Performing the Initial Configuration 46 Check Point IP2450 Security Platform Installation Guide ...
Страница 128: ...A Technical Specifications 128 Check Point IP2450 Security Platform Installation Guide ...
Страница 132: ...B Compliance Information 132 Check Point IP2450 Security Platform Installation Guide ...
Страница 136: ...Index 136 Check Point IP2450 Security Platform Installation Guide ...