OPERATION
Monsoon
t
(07--99)
3
MACHINE INSTALLATION
UNCRATING MACHINE
Carefully check carton for signs of damage. Report
damages at once to carrier.
Check carton contents list below to ensure everything
is included. Contact your distributor for missing items.
Contents:
-- Machine
-- Handle
-- Hardware package
(stored in solution tank)
-- Dispenser Frame Weldment w/ Lift Pedal
-- Dispenser Assembly w/2 Knobs
-- 760 mm (30 in) Drip Bar
ATTACHING HANDLE
1. Attach handle to machine. Hardware package is
stored in solution tank.
2. Align handle to mounting holes and fasten with (4)
3/8x1--1/2” hex head screws with flat and lock
washers. Use a 9/16” wrench
(Figure 1.).
(4) 3/8x1-1/2 Screw
(4) Lock Washers
(4) Large Flat Washers
FIG. 1.
ATTACHING SOLUTION FLOW LEVER LINKAGE
1. Connect solution flow lever to solution valve
linkage arm.
2. Align solution lever to linkage arm and connect
with allen screw, (2) small flat washer and nylon
lock nut. Use a 5/32” allen wrench and 7/16”
wrench
(Figure 2.).
(2) Flat Washers
(1) Allen Screw
(1) Nylon Lock Nut
Solution Flow
Lever Linkage
FIG. 2.
INSTALLING DISPENSER ASSEMBLY
1. Place dispenser frame weldment under machine
and fasten to mounting bracket that is factory
installed. Use two clevis pins as shown, secure
with two hair pins
(Figure 3.).
(2) Clevis Pins
Dispenser
Frame Weldment
(2) Hair Pins
FIG. 3.
2. Position pedal between pedal brackets at rear of
machine. Insert clevis pin through brackets and
pedal, secure with hair pin
(Figure 4.).
Clevis Pin
Pedal
Brackets
Hair Pin
FIG. 4.