Use and Maintenance Manual model “A8 - A10 V/C ROUND/TOP”
10
ENGLISH
3.7 DOCUMENTATION TO ISSUE
When installation is concluded, the installation tech-
nician must deliver to the user:
•
the use and maintenance booklet of the appli-
ance supplied by the manufacturer;
•
the technical documentation of the accessories
used and subject to maintenance;
•
the documentation relevant to the evacuation
system of combustion products;
•
The system booklet (where planned);
•
the documentation certifying installation;
The useful documentation for installation liability
must include:
•
a detailed description (also including photo-
graphs) of the presence of other heat generators;
•
Declaration of Conformity of the system
to standard (M.D. 37/08);
•
general description, or diagram or
photographic documentation of the changes
made to the system, if intervention was necessary
during installation;
• Use of certified material with the CE mark
(305/2011);
•
possible instructions relating to the warranty;
•
the date and signature of the installation techni-
cian;
NOBIS SRL cannot be held in any way liable in the
event of non-compliance with the installation and
start-up standards of its products.
3.8
UNPACKING THE PRODUCT
Packaging is composed of box-
es in recyclable cardboard ac-
cording to the RESY standards
and wooden pallets. All pack-
aging materials can be re-used
for similar use or, if necessary, dis-
posed of as urban waste, in com-
pliance with legislation in force.
Remove the strap binding the
pallet to the packaging and lift
the cardboard; remove the plas-
tic bag around the product,
ensuring it is intact.
The body must always be
moved in a vertical position using
trolleys.
Pay particular attention
so that the door and its glass are
protected against mechanical
impact which would compro-
mise their integrity.
If possible, unpack the
product near the area where it
will be installed.
To remove the appliance from the pallet, you can
remove the two screws placed under the pallet (13
hex key) to release the appliance from the wooden
base.
Position the equipment and proceed with its
connection to the chimney flue. Find,
using the 4 adjustment feet, the right level so that
smoke discharge and the pipe are connected
correctly.
3.9 INSTALLATION WARM AIR DUCTING KIT
Remove the cast iron cover from the stove,
disassemble the right side (front view) and remove
the ducting kit from the packaging.
CONNECT CANALIZATION TO STOVE
Remove the right rear side.
Remove the pre-drilled blank from the sheet metal
with the assistance of a suitable tool (e.g. pry with
screwdriver)
Содержание A10C ROUND
Страница 1: ...EN Installation use and maintenance manual A8 V C ROUND TOP A10 V C ROUND TOP...
Страница 37: ...Use and Maintenance Manual model A8 A10 V C ROUND TOP 37 ENGLISH MAINTENANCE DATE INTERVENTION CARRIED OUT...
Страница 38: ...Use and Maintenance Manual model A8 A10 V C ROUND TOP 38 ENGLISH NOTE...
Страница 39: ......