16
Solar Collectors - APOLLON
6.
In case of two collectors, first place the left one at the bottom part
5
, lifting the upper part
5
. Place the screws and
the collector’s fixing washers (4 for each collector) without tightening them. Place mechanically tightened Ø22
unions at the edges of the collector.
7.
Join the second collector and tighten the unions*.
Tighten all screws on the base.
8.
Place a T-piece with the air bleed and the sensor slot at the upper left part of the collector. Connect the pipe to
the system’s heat exchanger inlet.
9.
Place a 3/4” Ø22 mechanically tightened at the collector bottom right edge for the connection of the boiler line*.
Connect the pipe to the system’s heat exchanger outlet.
10.
Place a Ø22 mechanically tightened copper plugs on the upper right and bottom left edge of the collector/s.
11.
Place the intermediate decorative channel (optionally), clasp the piping covers and fasten up the plugs at the
bottom part.
*Use lock nuts in order to avoid the copper tube mechanical strain.
60mm
STEP 8
STEP 9
STEP 6
STEP 10
Содержание Apollon Meander AL GRD MDR
Страница 1: ...Technical Manual Installation maintenance use instructions Solar collectors Meander AL GRD MDR ...
Страница 2: ......
Страница 19: ......